Hybrids
- PEol-FV 043 AC. Tacio, Sumanus, Suadela, Soranus and Silver wind installations of 30 MW each, and their hybridization with their respective photovoltaic plants of 21.43 MWp/19.52 MWins each, in the province of Zaragoza.
- PEol-FV-078. Hybrid generation plant HIB CTCC Escatrón of 764.2 MWins / 274.6 MWn, in the province of Zaragoza.
- Pet-FV 118. Photovoltaic installation Las Majas VII A of 10.89 MW of installed power, for its hybridization with the existing wind farm “Las Majas VII A” of 49.40 MW of installed power, and its evacuation infrastructure, in the province of Zaragoza.
- Pet-FV 119. Photovoltaic installation Las Majas VII B of 10.89 MW of installed power, for its hybridization with the existing wind farm “Las Majas VII B” of 49.40 MW of installed power, and its evacuation infrastructure, in the province of Zaragoza.
- PEol-FV 120. Photovoltaic installation Las Majas VII C of 10.89 MW of installed power, for its hybridization with the existing wind farm “Las Majas VII C” of 49.40 MW of installed power, and its evacuation infrastructure, in the province of Zaragoza.
- Pet-FV 121. Photovoltaic installation Las Majas VII D of 24.25 MW of installed power, for its hybridization with the existing wind farm “Las Majas VII D” of 49.40 MW of installed power, and its evacuation infrastructure, in the province of Zaragoza.
- PEol-Fv 161. Ríos FV hybridization project, with 36 MW of installed photovoltaic power and 30.5 MW of wind, and its evacuation infrastructure, in the province of Zaragoza.
- PEol-FV-ALM-002. CSFA Hybridisation Valdejalón, which integrates the new electricity generation module of photovoltaic solar technology, of 45 MWins, and the new storage facility with energy injection to the grid, of 5 MWins. For its hybridization with the existing Valdejalón wind farm of 50 MWins, and its associated evacuation infrastructure, in the province of Zaragoza.
- PEol-FV-ALM-013. CSFA Hybridisation El Tollo, which integrates the new electricity generation module of photovoltaic solar technology, of 45 MWins, and the new storage facility with energy injection to the grid, of 5 MWins. For its hybridization with the existing wind farm El Tollo of 50 MWins, and its associated evacuation infrastructure, in the province of Zaragoza.
- PEol-FV-ALM-015. CSFA Hybridisation Picador, which integrates the new electricity generation module of photovoltaic solar technology, of 45 MWins, and the new storage facility with energy injection to the grid, of 5 MWins. For its hybridization with the existing wind farm Picador of 49.95 MWins, and its associated evacuation infrastructure, in the province of Zaragoza.
- PEol-FV-ALM-017._CSFA Hybridisation Las Azubías, which integrates the new electricity generation module of photovoltaic solar technology, of 45 MWins, and the new storage installation with energy injection to the grid, of 5 MWins. For its hybridization with the existing wind farm Las Azubías of 46 MWins, and its associated evacuation infrastructure, in the province of Zaragoza.
- PEol-FV-ALM-018. CSFA Hybridisation El Llano, which integrates the new electricity generation module of photovoltaic solar technology, of 45 MWins, and the new storage facility with energy injection to the grid, of 5 MWins. For its hybridization with the existing wind farm El Llano of 50 MWins, and its associated evacuation infrastructure, in the province of Zaragoza.
- PEol-FV-167. Solar photovoltaic plant “Hybridisation Belchite” of 13.5 MW of installed power, and its evacuation infrastructure, in the municipality of Belchite, province of Zaragoza, for its hybridisation with the existing wind farm “Belchite”, of 47.85 MW.
- PEol-FV-168. Solar photovoltaic plant “Herrera de los Navarros” of 21 MW of installed power, and its evacuation infrastructure, in the municipality of Herrera de los Navarros, province of Zaragoza, for its hybridization with the existing wind farm “Herrera de los Navarros”, of 35 MW.
- PEol-FV-194 AC, which comprises the hybridization of existing photovoltaic solar farms with the following wind farms: Wind Farm, Wind Farm Two, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Wind Farm, Farm, Wind Farm, Farm, Farm Farm Farm, Farm, Farm, Farm, Farm, Farm, Farm, Farm, Farm, Farm, Farm, Farm, Farm, Farm, Farm, Farm,