PEol-FV 043 AC. Tacio, Sumanus, Suadela, Soranus and Silver wind installations of 30 MW each, and their hybridization with their respective photovoltaic plants of 21.43 MWp/19.52 MWins each, in the province of Zaragoza.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Zaragoza, Épila, Calatorao, La Muela, Lucena de Jalón and Alfamén (Zaragoza).
Power: 150 MW.
Holder: Inexhaustible Energy of Tacio S.L., Inexhaustible Energy of Sumanus S.L., Inexhaustible Energy of Suadela S.L., Inexhaustible Energy of Soranus S.L. and Inexhaustible Energy of Silver S.L. Being Inexhaustible Energy of Soranus S.L. The promoter that represents all the mercantiles.
Projects content:
- Tacio wind power plant of 30 MW and its hybridization with its respective photovoltaic plant of 21.43 MWp/19.52 MWins.
- 30 MW Sumanus wind facility and its hybridization with its respective 21.43 MWp/19.52 MWins photovoltaic plant.
- 30 MW Suadela wind facility and its hybridization with its respective 21.43 MWp/19.52 MWins photovoltaic plant.
- 30 MW Soranus wind facility and its hybridization with its respective 21.43 MWp/19.52 MWins photovoltaic plant.
- 30 MW Silver wind installation and its hybridization with its respective photovoltaic plant of 21.43 MWp/19.52 MWins.
The evacuation infrastructure is included in the PEol-783 AC, PFot-807 AC and PFot-815 AC files.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement:
- Starting date for processing: 11/23/2021
- Public Information BOE: 24/10/2022.
- Public information BOP Zaragoza: 25/10/2022.
- DIA Resolution: 27/11/2023.