Pet-FV 121. Photovoltaic installation Las Majas VII D of 24.25 MW of installed power, for its hybridization with the existing wind farm “Las Majas VII D” of 49.40 MW of installed power, and its evacuation infrastructure, in the province of Zaragoza.
INFORMATION OF THE FILE:
This new project will hybridize with the existing wind farm “Las Majas VII D” of 49.40 MW of installed power, already built for autonomous processing.
Municipal terms:
- Park: Moyuela (Zaragoza).
- Evacuation infrastructure: Moyuela and Azuara (Zaragoza).
Power: 24.25 MW.
Holder: Energy Forces of Southern Europe V, S.L.
Projects contained:
- Photovoltaic installation of 24.25 MWins.
- Evacuation infrastructure:
30 kV evacuation line to SET Las Majas VII.
Modificación de SET Las Majas VII D 30/220 kV, en el término municipal de Azuara (Zaragoza).
The rest of the shared evacuation infrastructure is included in another file.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement:
- Starting date for processing: 02/24/2023.
- Public Information BOE: 04/09/2023.
- Public information BOP Zaragoza: 07/09/2023.
- DIA Resolution: 18/10/2024.
- Resolution AAP and AAC: 19/02/2025.