PEol-Fv 161. Ríos FV hybridization project, with 36 MW of installed photovoltaic power and 30.5 MW of wind, and its evacuation infrastructure, in the province of Zaragoza.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Pedrola (Zaragoza).
- Evacuation infrastructure: Pedrola and Plasencia de Jalón (Zaragoza).
Power: 66.5 MWins.
Holder: ISC GREENFIELD 9, S.L.
Projects contained:
- Wind installation of 30.5 MWins.
- Photovoltaic installation of 36 MWins.
- Evacuation infrastructure:
Lifting substation “SET 1 30/220 kV”, located in the municipality of Pedrola (Zaragoza).
220 kV high voltage overhead line “SET 1 220/30 kV” to 220 kV high voltage overhead and underground line “SET Casablanca – SE Lions 220 kV”, between its supports 61 and 62. It runs through the municipal terms of Pedrola and Plasencia de Jalón (Zaragoza).
STATUS OF THE FILE:
Prior administrative authorization and environmental impact statement.
- Starting date for processing: 01/03/2023.
- Public Information BOE: 26/09/2024.
- Public information BOP Zaragoza: 30/09/2024.
- Resolution of discontinuation by the promoter of the AAP: 8/10/2025.