- It includes the improvement and expansion of the side roads and the interconnection of the motorway with municipal roads and with the industrial estates of Los Molinos and San Marcos.
- The operating conditions of the A-4 and the quality of public passenger transport services will be substantially improved, reducing journey times and ensuring greater regularity.
Transportes licita for 47.5 million euros the works to improve the accessibility of public transport on the A-4 in Getafe
The Ministry of Transport and Sustainable Mobility has awarded 47.5 million euros (VAT included) for the contract of works to improve the accessibility of public transport on the Motorway of the South A-4, between the industrial estates of Los Molinos and San Marcos, from kilometer 12 of the A-4 to Avenida Leonardo da Vinci (kilometer 15.2 of the A-4), in the municipality of Getafe, province of Madrid.
The planned actions aim to achieve a substantial improvement in the operating conditions of the A-4 and in the quality of public passenger transport services, reducing journey times and ensuring greater regularity.
The main actions to be carried out are:
- On the right side of the A-4, in the direction of Andalusia:
- Lateral track of one, two or three lanes, depending on the sections, between the 12,350 and 13,750 kilometers.
- Roundabout with a lane from the side road, in order to facilitate access to the San Marcos polygon
- Transformation of the existing link with the M-406 road into a diamond-like link with weights, adding a western roundabout approximately symmetrical to the existing one.
- On the left side of the A-4, in the direction of Madrid:
- Third lane from around 15.35 km to the access area to the facilities of the Los Angeles Hotel and the adjacent service station
- New branch of incorporation from the existing roundabout (with the M-406) to the lateral track.
- Other noteworthy performances:
- Demolition of the pedestrian walkway located at kilometre 13,13, and replacement by a new pedestrian walkway at kilometre 13,1 that saves the main vials with a single vain.
- Second walkway at kilometer 15,030 for the replacement of the footpath of San Marcos, which will also service the two bus stops located in the area.
- Remodeling of the access from Eratosthenes Street to the side road (optimizing the design of the accesses to the Airbus facilities).
- Relocation of two bus stops on each side track so that its position is compatible with the planned performances.