- Two contracts are put out to tender that include actions on the A-4 including containment systems on both roads and the maintenance of 30 km of the A-2.
- This investment is carried out within the framework of the maintenance program of the State Road Network to guarantee the conditions of circulation, road and safety.
- Actions such as the surveillance and attention of accidents, the winter road, the communication service or the maintenance of facilities are collected.
- The specifications include conditions to promote the improvement of energy efficiency and the reduction of emissions of the activity of the General Directorate of Roads.
The Ministry of Transport and Sustainable Mobility has litigated for 27,708 million euros the conservation and exploitation of 120 kilometers of the State Road Network (RCE) in the Community of Madrid, after having been authorized in the Council of Ministers. The tender is distributed in two contracts that include both lots with specific actions in the Community of Madrid.
These actions are aimed at the conservation of different sections along more than 50 km of the A-4, the implementation of containment systems on both roads of the A-4 between kilometers 5.1 and 52.3 and of much of the route of the A-2.
The duration of the contracts is three years, with the possibility of extension of two years and an additional one of a maximum of 9 months. These include requirements to promote energy efficiency and emission reduction.
The planned work is part of the program of the Ministry of Transport and Sustainable Mobility to maintain traffic, road and safety conditions in the State Road Network (RCE), ensuring that it is accessible in the appropriate conditions to all citizens.
Characteristics of the conservation model
The model of mixed contracts (services and works) for the execution of conservation and exploitation operations in the State Road Network aims to offer a comprehensive service of mobility to the user, improve the state of the road and network and optimize public resources.
Through them, works are carried out to help the roads and ordinary conservation of the roads, to allow the infrastructure and its functional elements to have the best possible conditions of circulation and safety. It includes actions such as: road management, incidents and winter roads, operating aid and road safety studies, and maintenance of road elements with adequate levels of quality. It incorporates energy efficiency measures and emissions reduction, such as self-consumption, energy saving measures in lighting or the implementation of electric motor vehicles, and the presentation of a decarbonization plan by the awardee, in the first six months of the contract, with reduction and emissions compensation measures to achieve a carbon neutral balance of all the activity object of the contract during the term of the same.