The Ministry for the Ecological Transition and the Demographic Challenge (MITECO), through the Institute for Diversification and Energy Saving (IDAE), has allocated 165 million euros in support of the incentive program for innovative energy storage projects through reversible pumping (BORALMAC 2), almost 94 million for two projects in Asturias: the reversible pumping hydroelectric plant in Grandas de Salime (45 million) and the reversible pumping plant of La Barca (48.82 million).
Given the high amount of aid requested, the budget was extended in April by 75 million out of the 90 million initially foreseen, which is yet another proof of the interest aroused by this NextGenEU-funded program of the Recovery, Transformation and Resilience Plan (PRTR).
The final resolution of BORALMAC 2, available here, It includes the promotion of seven reversible pumping projects in different parts of the Spanish territory. The beneficiary hydroelectric power plants are located in Andalusia, Asturias (2), Aragon, Extremadura, Catalonia and Galicia. In total, the projects will add 2,071 MW of installed generation capacity and will increase the storage capacity of the electricity system by 21,091 MWh.