Execution of works of the project of replacement and execution of enclosures between pp.kk. 122/100 and 123/243 on the left side of line 100 Madrid-Chamartín-Hendaya. municipality of Ávila.
Execution of the Project of Replacement and Execution of Enclosures between PP.KK. 122/109 and 123/332 on the right side of line 100 Madrid - Chamartín - Hendaya. Municipality of Ávila
Work of Reform of the Penitentiary Center of Brieva (Ávila) (23.007.RCP1015.OB.08)
Energy Efficiency Improvement Project at the Civil Guard Command in Burgos within the framework of the PRTR financed by the NextGenerationEU Funds (23.096.TE4013.OB.08)
33-BU-4380; 54.519/23; Road safety. Complementary works in the new access to the Burgos Airport. N-120 road. PP.KK. 107,600. Province of Burgos
Office renovation work for new digital competence center in the maintenance base of miranda de ebro
Supply and placement of wooden pavement on metal bridges for the project “Santander Mediterráneo Natural Road Conditioning Project (Castellanos de Bureba-City/Dosante section, Burgos Province)”, financing of the project through the European Agricultural Fund for Rural Development (EAFRD) within the National Rural Development Programme 2014-2020, to be awarded by simplified open procedure.
Execution of the works, start-up and operation in tests of the Project of expansion of the Wastewater Treatment Station and improvement of the Sanitation of Miranda de Ebro (Burgos).
Establecimiento del acuerdo marco de contratos tipo obra en régimen de alquiler de dumper extravial con operario y combustible en el ámbito territorial de la Gerencia de León hasta el 31 de mayo de 2027, vinculadas al Plan de Recuperación, Transformación y Resilencia (PRTR), a programas cuya financiación provenga de fondos de la Unión Europea (FEADER, FEDER…) y resto de obras de la Gerencia de León, a adjudicar por procedimiento abierto.
Perfilado del balasto en vía férrea para la obra: "Premantenimiento de la plataforma del tramo León - Pola de Lena. Corredor Norte - Noroeste de Alta Velocidad”, a adjudicar por procedimiento abierto simplificado.
PY-005-UM-23.- León / San Andrés de Rabanedo / Base Militar Conde de Gazola- UME / Construcción de edificio de mando UDRUME
Conclusión de acuerdo marco para la excavación con explosivos, carga y transporte de estériles de minería en las obras de restauración ambiental de minas de la Provincia de León en el marco del Plan de Recuperación, Transformación y Resiliencia, financiado por la Unión Europea – Nextgeneration EU, correspondientes a proyectos de zonas degradadas a causa de la minería del carbón, a adjudicar por procedimiento abierto simplificado
Ejecución de obras de adecuación y modificación de los apoyos del viaducto de Huergas para la obra: "Premantenimiento de la plataforma del tramo León - Pola de Lena. Corredor Norte - Noroeste de Alta Velocidad”, a adjudicar por procedimiento abierto.
Obras para la ejecución del proyecto simplificado de reposición y ejecución del cerramiento de la terminal de mercancías de León
Adecuación Drenaje Campo De Vuelos. Aeródromo Militar Virgen Del Camino (León)
LEÓN / San ANDRÉS DE RABANEDO / Base Conde de Gazola / Unidad Militar de Emergencias (UME) / Rehabilitación pista de atletismo
Construcción, legalización y puesta en servicio de una planta solar fotovoltaica de autoconsumo sin excedentes, que abastezca al Centro de Desarrollo de Tecnologías de Cubillos del Sil de la Fundación Ciudad de la Energía-CIUDEN, F.S.P., en el Marco del Plan de Recuperación, Transformación y Resiliencia (PRTR)
Execution of the Palencia – Aguilar de Campoo High Speed Line platform construction project. Stretch: Calsalvo de Boedo – Alar del Rey.
contracting the execution of the works for a minimum maintenance of the S.E. building Post and Telegraph, S.A., S.M.E., en Herrera del Pisuerga, Palencia, situado en la avenida Eusebio Salvador Merino 14.
New Electrical Connection for Charging Points for Handling Equipment Aeropuerto De Salamanca
Contracting of civil works, supply of equipment and start-up for the execution of the project of construction of the Hydroelectric Power Plant of Irueña (Salamanca)
Salamanca/Villagonzalo de Tormes/Energy rehabilitation building 45 hangar and annexes/Air Base of Salamanca
Works of reform for the splitting of the pavilion of charge no. 2 at the Air Base of Matacán, Villagonzalo de Tormes, Salamanca.
Execution of the works of Phase 1 of the “Updating of the Project of the collector of the Tejadilla Stream” (Segovia). Co-financed by the EU Reconstruction Fund (Next Generation EU)
Execution of walkways and adaptation of pedestrian itineraries on the N-603 P.K. Road. 71+140 in Los Angeles de San Rafael, El Espinar. Province of Segovia. Recovery, Transformation and Resilience Plan, Next Generation EU.
33-SO-3380; 54.497/23. Proyecto de humanización, Integración Urbana y Ordenación de los distintos usos de lasTrav de la Crta N-111, EntreP.K. 226+330 y P.K. 227+130 Ctra de Logroño, y de la Ctra N-234, Entre El P.K. 348+750 y el P.K. 349-201y del P.K. 349+312 al 350+230 C/ Agustin, Soria. Provincia de Soria. Plan de Recuperación, Transformación y Resiliencia, Next Generation EU.
Ejecución de la cimentación y estructura de hormigón para la obra “Proyecto de construcción de la nueva base BRIF de Lubia (Soria)”, enmarcadas en el Plan de Recuperación, Transformación y Resiliencia financiado por la Unión Europea – Next Generation EU, a adjudicar por procedimiento abierto simplificado.
Obra del Acuartelamiento de la Guardia Civil en San Esteban de Gormaz (Soria)
Autovía de Navarra A-15. Tramo: Fuensaúco Villar Del Campo. Provincia Soria.
Redacción del proyecto constructivo y ejecución de las obras para la modificación de la funcionalidad de la protección automática de los pasos a nivel clase "A3", en los p.k. 42/750 y p.k. 43/216 de la línea 202 Torralba - Soria, en el término municipal de Coscurita (Soria).
Ejecución de las obras del “Proyecto constructivo de las obras de incorporación de caudales al emisario de la EDAR de Sinova (Soria)”
Restoration works of the envelope of the Bank of Spain branch in Valladolid
Execution of the works of the Construction Project of the New Railway Complex of Valladolid. Phase II.
Work of execution of pedestrian access in the maintenance bases of can tunis av, zaragoza and bmi of valladolid
Roofed Paid Parking Of Rotating Vehicles And Employees. - Valladolid Airport
12-ZA-3450.B; 54.492/23 Autovía del Duero, A-11. Stretch: Link San Martín Del Pedroso – Portuguese Border. Province Zamora
32-VA-4270; 54.996/22. Sustainable rehabilitation of the firm on the A-6 Motorway between the PP.KK. 239,000 to 261,000. Stretch: Villalpando-Benavente, through the use of semi-hot mixtures with low temperature bitumen of manufacture and extended. Province of Zamora
Works of the Project of adaptation of works in segregated plots in the Industrial Performance “The Hiniesta Expansion”, in Zamora