Execution of the works of the constructive project for the suppression of the passage at the level of kilometric point 127/617 of the line Madrid-Hendaya, in the Dehesa de Pedrosillo, municipality of Ávila.
Low voltage installation for the execution project for the adaptation of the project of Casa de Los Águila for use by the museum of Ávila, to be awarded by simplified open procedure.
Execution of works of the project of replacement and execution of enclosures between pp.kk. 122/100 and 123/243 on the left side of line 100 Madrid-Chamartín-Hendaya. municipality of Ávila
Work of Reform of the Penitentiary Center of Brieva (Ávila) (23.007.RCP1015.OB.08)
Energy Efficiency Improvement Project at the Civil Guard Command in Muñogalindo (Ávila) within the framework of the PRTR financed by the NextGenerationEU Funds (23.099.TE4014.OB.08)
Execution of the works of the “Valued descriptive report of the Works for the repair of the building of the E.B.A.R. de Villarmero, in the collector of the Ubierna River (Burgos), through the micropilotage procedure.”
12-BU-4290; 54.752/22 Construction Project Autovía A-73, Burgos-Aguilar De Campoo. Quintanaortu⦅⦆ -Montorio stretch”. Province of Burgos.
MDEF 132 Intervention in improving energy efficiency and thermal envelope through actions on different buildings and infrastructure, Base Cid Campeador, Castrillo del Val (Burgos), framework agreement works, lot 1 Castilla y León.
Infrastructure Improvement Performance (AMI): Adaptation of the trench between the pp.kk. 444/620 to 444/731. L/100 Madrid-Hendaye
Work of renovation of changing rooms and new dining room in bm miranda ebro motor
Civil work for the installation of a shoe press in the bm miranda de ebro towed
12-BU-4300.A; 54.1015/22 Autovía del Duero (A-11). Connection of the Motorway with the N-122 Road in the vicinity of Castrillo de la Vega. Province of Burgos.
Obras de reforma del pabellón oficial 3ºD bloque 21 Acuartelamiento “El Parque”
Reparación y sostenimiento del talud situado en el p.k. 103+850 de la carretera N-630, en la provincia de León.
Reforma en el sistema de climatización del departamento de enfermería en el centro penitenciario de León (Mansilla de las Mulas)
20237137 PRTR León/Valverde de la Virgen/Rehabilitación energética edificio 30 jefatura/aeródromo militar de León (MDEF065-LOTE 4)
Obras de reposición de sistemas de contención de la margen izquierda de la calzada izquierda de la estructura sobre el arroyo Valdemolín en el p.k. 390+900 de la autovía A-6 y de la estructura sobre la carretera LE-5207 en el p.k. 397+252 de la N-6, subsanando la situación de grave peligro existente. Provincia de LEÓN.
Ejecución de la obra civil de las arquetas asociadas a la balsa de regulación para la obra: "Proyecto de modernización del regadío en la Comunidad de Regantes del Canal Alto de Villares (León). Fase SEIASA”, financiación de la actuación mediante el Fondo Europeo Agrícola de Desarrollo Rural (FEADER) dentro del Programa de Desarrollo Rural de Castilla y León 2014-2020, a adjudicar por procedimiento abierto simplificado.
Conclusión Acuerdo Marco para excavación con arranque con explosivos, carga y transporte de estériles de minería en la obra Restauración ambiental de la explotación a cielo abierto Gran Corta de Fabero (León), en el Marco del Plan de Recuperación, Transformación y Resiliencia, financiado por la Unión Europea – NEXTGENERATION EU, proyectos de zonas degradadas a causa de la minería del carbón.
Ejecución de las obras del proyecto simplificado de acondicionamiento de espacios para servicio itinerante de circulación en el antiguo edificio de agentes de Ponferrada (León)
Obras para la ejecución del proyecto simplificado de reposición y ejecución del cerramiento de la terminal de mercancías de León
Emergencia de las obras y de los servicios por graves daños en el paso superior de la carretera N-120-a en el término municipal de Astorga, situado en el punto kilométrico 173+435 de la línea 800 León - A Coruña.
Obra de Reforma en las Instalaciones de Climatización y ACS del Centro Penitenciario de León en Mansilla de las Mulas (23.058.RCP1033.OB.08)
Pintado y señalización horizontal pista de vuelo y rodaje Aeródromo Militar de León
Proyecto de actuación de mejora de la conexión entre la s/e de Bembibre y el parque de Albares: línea de alta tensión y comunicaciones.-
Reforma aseos en alojamientos alumnos 1º curso ABA
Execution of the Palencia – Aguilar de Campoo High Speed Line platform construction project. Stretch: Calsalvo de Boedo – Alar del Rey.
Execution of the construction project of affections to the safety facilities of the extension of road to 1300m in the station of Osorno. Line 160 Palencia - Santander.
Works for the development of project and supply and installation of photovoltaic panels and removal of existing ones in the headquarters building of the Joint Provincial Directorate of the TGSS/INSS of Palencia
33-SA-4350; 54.964/22 Construction of pedestrian walkway in the P.K. 93+200 of the SA-20 road (Ronda Sur de Salamanca). Stretch: Salamanca. Province: Salamanca. Recovery, Transformation and Resilience Plan financed by the European Union NEXT GENERATION EU.
Contracting of the continuation work of accessibility, facilities and common elements and integration rehabilitation building Gran via 39-41 of Salamanca
Project design and implementation of a retaining wall between the kilometric points 114+250-114+800 left margin, in the Salamanca–Fuentes de Oñoro line
Works to improve the accessibility of the Government Subdelegation Building in Salamanca.
Contracting of civil works, supply of equipment and start-up for the execution of the project of construction of the Hydroelectric Power Plant of Irueña (Salamanca)
Drafting of the construction project and execution of the works for the renewal of the automatic protection of the passage to class A3 in the P.K. 23/005 of Line 120 Medina del Campo - Vilar Formoso, in the municipality of Calzada de Don Diego (Salamanca)
Repair of the access wall to the pool (demolition of the muret and levelling with the street and stabilization of the interior wall of containment), Act. Old Base of Cars, Segovia (TC 415-01/23), to be processed by AM works lot 1 Castilla y León.
33-SO-3370; 54.979/22 Humanization, Urban Integration and Management of Different Uses of the N-234 Road Crossings, between P.K. 351+500 and P.K. 352+770. Av. Valladolid and the N-111 Road, between P.K. 223+000 and P.K. 225+150. C/Eduardo Saavedra and Crta. Madrid, Soria. Province of Soria. Recovery, Transformation and Resilience Plan financed by the European Union NEXT GENERATION EU.
Work on the basic project and implementation of the Provincial Police Station in Soria (21.017.NPN2005.OB.02)
Installation of 3 charging points for electric vehicles, Base El Obstinado, Santovenir de Pisuerga (Valladolid) (TC 417-14/22), to be processed through AM works, lot 1 Castilla y León.
Work for transfer and expansion of the door preparation cabin in the integral maintenance base of Valladolid
Execution of the construction project for the suppression of the crossing at the level of the p.k. 202/459 of the line Madrid - Chamartín – Hendaya, municipality of Medina del Campo (Valladolid).
Urbanization ZVSN: refurbishment network, CMT Renedo-Cabezón, Cabezón de Pisuerga (Valladolid) (TC 417-02/22), to be processed through AM Works Lote 1 Castilla y León.
Work of the Civil Guard Quartering in Fuenteaúco (Zamora) (21.068.NGC3018.OB.02)
32-VA-4270; 54.996/22. Sustainable rehabilitation of the firm on the A-6 Motorway between the PP.KK. 239,000 to 261,000. Stretch: Villalpando-Benavente, through the use of semi-hot mixtures with low temperature bitumen of manufacture and extended. Province of Zamora
Works restoration facades and replacement exterior carpentry Delegation AEAT Zamora