PEol-FV-168. Solar photovoltaic plant “Herrera de los Navarros” of 21 MW of installed power, and its evacuation infrastructure, in the municipality of Herrera de los Navarros, province of Zaragoza, for its hybridization with the existing wind farm “Herrera de los Navarros”, of 35 MW.
INFORMATION OF THE FILE:
This project will hybridize with the existing wind farm “Herrera de los Navarros” of 35 MW installed capacity, already built for autonomous processing.
Municipal terms:
- Park: Herrera de los Navarros (Zaragoza).
- Evacuation infrastructure: Herrera de los Navarros (Zaragoza).
Power: 21 MWins
Holder: Energy Systems Barandón, S.A.
Projects contained:
- Photovoltaic installation of 21 MWins.
- Evacuation infrastructure:
Sectioning Center.
The rest of the shared evacuation infrastructure is included in another file.
STATUS OF THE FILE:
Environmental impact statement, prior administrative authorization and administrative construction authorization:
- Starting date for processing: 01/10/2024.
- BOE Public Information: 23/10/2024.
- Public Information BOP Zaragoza: 28/10/2024.