PEol-FV-ALM-018. CSFA Hybridisation El Llano, which integrates the new electricity generation module of photovoltaic solar technology, of 45 MWins, and the new storage facility with energy injection to the grid, of 5 MWins. For its hybridization with the existing wind farm El Llano of 50 MWins, and its associated evacuation infrastructure, in the province of Zaragoza.
INFORMATION OF THE FILE:
This project will hybridize with the “El Llano” wind farm of 50 MW of installed capacity, in operation, located in the municipality of Rueda de Jalón (Zaragoza).
Municipal terms:
- Park: Rueda de Jalón (Zaragoza).
Power: 50 MWins
Holder: Molinos del Ebro, S.A.
Projects contained:
- Photovoltaic installation of 45 MWins.
- Storage module with energy injection to the 5MWins network.
The evacuation infrastructure consists of an underground medium voltage power line and electrical installations necessary for connection with the existing electrical substation “SET Channels 220/20 kV”, from where, through the high voltage power line 220 kV “SET Cantales – SE Jalón 220 kV”, will be connected with the final point of delivery of the energy.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement:
- Starting date for processing: 08/11/2023.
- Public Information BOE: 11/12/2023.
- Public information BOP Zaragoza: 12/12/2023.