El Paso received a transfer from the Government of Spain in 2023/24 for infrastructure reconstruction and in 2024 for the Employment Plan with staff for technical offices among others.
It has been possible to see the LP-212 that will connect with the LP2 at the height of the Lomo del Piojo and with José Antonio Jiménez Street, connection with the Coranzoncillo area. Recovery of the water supply in the Romancierías area after the construction of a new reservoir. A road with bike lanes that will communicate the different points of the town. Hybrid installed street lamps with solar panels that, if the battery is exhausted, can be connected to the electricity network.
The terrarium Federico Simón de Las Mancha is being rehabilitated, creating new sports spaces. They will be equipped with a gym, multipurpose room, petanque court, residence for athletes, as well as a cafeteria and rest area.
Processing between 40 and 45% of the licenses of works of the homes affected by the Volcano in El Paso. And every day more.
On this occasion, the infrastructures under construction were visited, with the presence of the Special Commissioner for the Reconstruction of the Island of La Palma, Héctor Izquierdo, the Mayor of the City of El Paso, Eloy Martín, the Councilor for Urban Planning, David González and the Councilor for Public Works of the Cabildo, Darwin Rodríguez.