Titular: Obenque Solar, S.L., with C.I.F., with C.I.F. No. B-88209358, and address for notification purposes in Paseo de la Castellana, No. 163, 7th floor, 28046 Madrid.
Description of the Facilities included in the file:
- Photovoltaic plant Obenque Solar, with a peak power of 62.51MWp and an installed power of 55.36 MW, will be located in the municipality of Horche (Guadalajara). The energy generated will be carried by underground lines at 30 kV to the collecting substation ST Hojarasca I 220/30 kV. In order to comply with the conditions of the DIA and the AAP, the surface area has been reduced, as well as the power, with respect to the initial preliminary project.
- Underground evacuation lines at 30 kV, which will bring the generated energy to the ST Hojarasca 220/30 kV.
- Hojarasca Transformer Power Substation 220/30 kV, located in the municipality of Horche. It will raise the voltage up to 220 kV, for its transport.
- High voltage power line at 220 kV with origin of the substation SET Hojarasca 220/30 kV and final in the SET Henares 400/220/30 kVST, will run through the municipal terms of Horche, Guadalajara, Yebes, Valdarachas and Pozo de Guadalajara (Guadalajara – Castilla-La Mancha) and Santorcaz and Anchuelo (Community of Madrid). The line will consist of three circuits, mainly of aerial configuration, and underground between supports nº 32 and nº 37.
The rest of the evacuation infrastructures used by this plant up to ST Anchuelo 400 (REE) are the subject of other files.