Tular: Acequia Solar, S.L., with CIF. B888498969 and address for notification purposes in Calle Cardenal Marcelo Spínola, nº 4, 1º D, 28016, Madrid.
Object of the request: Declaration, in particular, of Public Utility of the project of Acequia Solar photovoltaic solar plant, and its evacuation infrastructure, in the provinces of Guadalajara and Madrid. Expte. PFot-602
Description of the Facilities included in the file:
- Planta fotovoltaica FV Acequia Solar, de 43,23 MW de potencia instalada, ubicada en Taracena, término municipal de Guadalajara.
- Underground evacuation lines at 30 kV, which will bring the generated energy to the Taracena 220/30 kV electrical substation.
- Electric substation Taracena 220/30 kV, located in the municipality of Guadalajara, which will raise the voltage to 220 kV, for its transport.
- 220 kV SET-Taracena – AP 56 aerial and underground evacuation power line, which will run through the municipal area of Guadalajara.
- Electric evacuation line of 220 kV AP 56 – SET Alcalá Colecora II. The line will run through the municipal areas of Guadalajara, Chiloeches and Pozo de Guadalajara, in the province of Guadalajara, and Los Santos de la Humosa, Santorcaz and Alcalá de Henares, in the province of Madrid.
- Extension of the SET Alcalá II Colecora 220 kV Substation, located in the municipality of Alcalá de Henares (Madrid). CONDITIONS PERTAINING TO THIS FACILITY ARE NOT ADDRESSED IN THIS APPLICATION.
The SET Alcalá II Colecora Substation and the rest of the evacuation infrastructures used by this plant up to ST Alcalá II 220 kV (REE) are the subject of other dossiers.