PEol-522 AC. 49.5 MW Luna, 40.6 MW Kaede, 49.5 MW Kodama, 49.5 MW Makami, 49.5 MW Kaminari, 49.5 MW Kairi, 16.5 MW Amikiri, 49.5 MW Delfino, 49.5 MW Fukei, 49.5 MW Cadmo, 49.5 MW Belerofonte and 49.5 MW Kyoko and their evacuation infrastructure in the provinces of Zaragoza, Navarra and Álava.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Asín, Biota, Ejea de los caballeros, Luesia, Sáabas and Uncastillo (Zaragoza).
- Evacuation infrastructure: Ujué, Pitillas, Beire, Olite, Tafalla, Artajona, Añorbe, Enériz, Adiós, Muruzábal, Uterga, Legarda, Tares, Cendea de Olza, Arakil, Irañeta, Uharte Arakil, Arrazáurra, Asparagus, Arrazzurra, Arakaria, Saragossa, Saragossa, Saragossa, Arayurra, Saragara
Power: 552.1 MW
Holder: Inexhaustible Energy of Luna S.L., Inexhaustible Energy of Kaede, S.L., Inexhaustible Energy of Kodama, S.L., Inexhaustible Energy of Makami, S.L., Inexhaustible Energy of Kaminari, S.L., Inexhaustible Energy of Kairi, S.L., Inexhaustible Energy of Amikiri, S.L., Inexhaustible Energy of Delfino, S.L., Inexhaustible Energy of Fukei, S.L., Inexhaustible Energy of Cadmo, S.L., Inexhaustible Energy of Belerofonte, S.L. and Inexhaustible Energy of Kyoko, S.L. Being Inexhaustible Energy of Kyoko, S.L. The promoter that represents the rest of the companies.
Projects contained:
- Luna wind installation of 49.5 MW.
- Kaede wind installation of 40.6 MW.
- Kodama wind installation of 49.5 MW.
- Makami wind installation of 49.5 MW.
- Kaminari wind installation of 49.5 MW.
- Kairi wind installation of 49.5 MW.
- Amikiri wind installation of 16.5 MW.
- Delfino wind installation of 49.5 MW.
- Fukei wind installation of 49.5 MW.
- Cadmo wind installation of 49.5 MW.
- Belerofonte wind installation of 49.5 MW.
- Kyoko wind installation of 49.5 MW.
- Evacuation infrastructure:
Transformer Electrical Substation SET Malpica 30/220 kV.
High Voltage Line 220 kV SET Malpica – SET Bayo of 12.91 kilometers in length.
Transformer Electrical Substation SET Bayo 30/220/400 kV.
High Voltage Line 400 kV SET Bayo – SET Promoters Vitoria of approximately 165,071 kilometers in length.
Transformer Electrical Substation SET Promoters Vitoria 220/400 kV.
High Voltage Line 220 kV SET Promoters Vitoria – SET Vitoria 220kV of 657 meters in length.
STATUS OF THE FILE:
Prior administrative authorization and environmental impact statement.
- Starting date for processing: 06/17/2021.
- Public Information BOE: 09/28/2021.
- Public information BOP Zaragoza: 07/10/2021.
- Public information BOP Navarra: 10/8/2021.
- Public information BOP Álava: 09/27/2021.
- DIA Resolution: 18/09/2023.
- Resolution AAP Luna: 18/12/2023.
- Resolution AAP Kaede: 18/12/2023.
- Resolution AAP Kaminari: 18/12/2023.
- Resolution AAP Kyoko: 18/12/2023.
- Resolution AAP Makami: 18/12/2023.
- Resolution AAP Delfino:18/12/2023.
- Resolution AAP Fukei:18/12/2023.
- Resolution AAP Cadmo:18/12/2023.
- Resolution AAP Belerofonte:18/12/2023.