PEol-FV-ALM-020 AC. Hybrid facilities: HB1 San Martín de 454.37 MWins, HB2 La Plana de 183.04 MWins, HB3 Ítaca de 124.54 MWins, HB4 La Masada de 152.84 MWins, HB5 Bonilo de 537.79 MWins, HB6 El Tambor de 132.3 MWins and HB7 Pitarra de 259.23 MWins, and its evacuation infrastructure in the provinces of Teruel and Zaragoza.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Albalate del Arzobispo, Alcañiz, Alcorisa, Andorra, Calanda, Castelnou, Hijar, Jatiel, La Puebla de Hijar and Samper de Calanda (Teruel); Lécera (Zaragoza).
- Evacuation infrastructure: Albalate del Arzobispo, Alcañiz, Alcorisa, Andorra, Azaila, Calanda, Castelnou, Hijar, Jatiel, La Puebla de Hijar, Samper de Calanda and Vinoli (Teruel); Almochuel (Zaragoza).
Power: 1844.11 MWins
Holder: Enel Green Capital España, S.L.
Projects contained:
- Hybrid installation HB1, formed by the photovoltaic and storage plant BESS San Martín, of 280.77 MWins and the wind farm Empeltre, of 173.6 MWins.
- Hybrid installation HB2, formed by the Santa María photovoltaic plant, of 96.24 MWins and the La Plana wind farm, of 86.8 MWins.
- Hybrid installation HB3 formed by the San Macario photovoltaic plant, of 68.74 MWins and the Ítaca park, of 55.8 MWins.
- Hybrid installation HB4 formed by the Calanda photovoltaic plant, of 41.24 MWins and the Alcor wind farm, of 111.6 MWins.
- Hybrid installation HB5 formed by the photovoltaic plant Calandrias, of 426.19 MWins and the wind farm El Castillo, of 111.6 MWins.
- Hybrid installation HB6 formed by the photovoltaic and storage plant El Tambor, of 84.3 MWins and the wind farm La Torica, of 48 MWins.
- Hybrid installation HB7 made up of the photovoltaic plant Otorlo, of 151.22 MWins and the wind farm Pitarra, of 108 MWins.
- Evacuation infrastructure:
Electrical Substation Empeltre 220/33 kV.
San Martín Electrical Substation 220/33 kV.
High voltage airline 220 kV "SE Empeltre – SE San Martín", of 15,338 km.
High voltage airline 220 kV "SE San Martín – SEC La Plana", of 28.24 km.
High voltage airline 220 kV "SE Santa Maria – SEC La Plana", of 12.69 km.
Santa María Electrical Substation 220/33 kV.
San Macario Electrical Substation 220/33 kV.
Electric substation Ithaca 220/33 kV.
High voltage airline 220 kV "SE San Macario – SE Ítaca", of 5.3 km.
High voltage airline 220 kV "SE Ítaca – SEC Alcor", of 9.47 km.
Calanda Electrical Substation 220/33 kV.
Air-underground high-voltage line 220 kV "SE Calanda – SEC Alcor", of 11.11 km.
High voltage airline 400 kV "SE El Castillo – SE Calandrias", of 11.09 km.
High voltage airline 400 kV "SE Calandrias – SEC Otorlo", of 6.92 km.
Calandrias Electric Substation 400/33 kV.
Electrical Substation El Castillo 400/33 kV.
Electrical Substation La Torica 220/33 kV.
Electrical Substation The Drum 220/33 kV.
High voltage airline 220 kV "SE La Torica – SEC La Plana", of 8.92 km.
High voltage airline 220 kV "SE El Tambor – SE La Torica", of 3.1 km.
La Masada Electric Substation 400/220/30 kV.
High Voltage Overhead Line 400 kV "SEC La Masada – SE Mudéjar 400 kV" and Point of
Measure, of 6.4 km.
Electrical Substation La Plana 400/220/33/30 kV.
High voltage airline 220 kV "SEC Alcor – SEC La Masada", of 1.27 km.
Alcor Electrical Substation 220/33 kV.
400/33 kV Onboard Electric Substation.
High voltage airline 400 kV "SEC Otorlo – SEC La Masada", of 7.91 km.
High voltage airline 400 kV "SEC La Plana – SEC La Masada", of 26.12 km.
STATUS OF THE FILE:
Environmental impact statement and prior administrative authorization:
- Starting date for processing: 24/01/2024.
- Public Information BOE: 02/29/2024.
- Public information BOP Teruel: 02/29/2024.
- Public information BOP Zaragoza: 02/03/2024.
- DIA Resolution: 09/02/2026.