Hybrids
- CCC-002. Photovoltaic installation Saurus of 137.03 MWn/155.10 MWp, for its hybridization with the combined cycle thermal power plant “Castelnou” located in the municipal areas of Castelnou and Samper de Calanda, and its evacuation infrastructure, in the province of Teruel.
- PEol-FV-ALM-019. Hybrid installation “Mudéjar hybrid” formed by the 75 MWins “San Jorge” wind farm and a 42 MWins “BESS Mudéjar” battery storage system, for its hybridization with the 68,144 MWins PFot-285 Mudéjar photovoltaic park, in the province of Teruel.
- PEol-FV-ALM-020 AC. Hybrid facilities: HB1 San Martín de 454.37 MWins, HB2 La Plana de 183.04 MWins, HB3 Ítaca de 124.54 MWins, HB4 La Masada de 152.84 MWins, HB5 Bonilo de 537.79 MWins, HB6 El Tambor de 132.3 MWins and HB7 Pitarra de 259.23 MWins, and its evacuation infrastructure in the provinces of Teruel and Zaragoza.
- PFot-ALM-037. Battery storage facility “BESS Hybridisation FV Teruel” of 27.64 MWins, with a capacity of 59,904 MWh and its evacuation infrastructure in the province of Teruel, for its hybridisation with the existing photovoltaic solar park “FV Teruel”, of 42.56 MW.