PFOT 054 Solar Photovoltaic Park Albars, with 90.45 MW of installed power, and its evacuation infrastructure, in the province of Madrid
PFOT 062 Cruz photovoltaic installation, with 64.1 MW of installed capacity, and its associated evacuation infrastructures, in the municipal districts of Fuenlabrada, Humanes de Madrid and Parla, in the province of Madrid.
PFOT 065 La Vega, of 130 MWp, and its evacuation infrastructure, in the Autonomous Community of Madrid.
PFOT 072 Gasset solar photovoltaic plant of 258 MWp and 200MWn, and its associated evacuation infrastructures, in the province of Madrid
PFOT 124 Photovoltaic installation Las Fresas of 8.95 MW of installed power, as well as for the underground line at 15 kV for electric energy evacuation, in the municipal terms of Ocaña, in the province of Toledo, and Aranjuez, in the province of Madrid
PFOT 160 Aldehuela solar photovoltaic plant, of 130 MW, and its evacuation infrastructure, located in the municipal terms of Getafe and Madrid.
PFOT 161 Galatea I photovoltaic parks of 145.26 MWp, and their evacuation infrastructures, in the province of Madrid
PFOT 163 Parque fotovoltaico Galatea II 139,15 MW instalados , y sus infraestructuras de evacuación, en la provincia de Madrid.
PFOT 172 74 MWp Solar Keel Photovoltaic Plant and its evacuation infrastructure in the province of Madrid
PFOT 184 Photovoltaic installation Obenque Solar, of 55.36 MW of installed power, and its evacuation infrastructures
PFOT 185 Maladeta Solar photovoltaic installation, with 162.56 MW of installed power, and its evacuation infrastructures,
PFOT 191 Abarloar Solar photovoltaic installation, with 82.5 MW of installed power, and its evacuation infrastructures
PFOT 192 87.50 MWp/ 82.5 MW Solar Powered Solar Photovoltaic Plant installed and its evacuation infrastructures
PFOT 204 Instalación fotovoltaica Abeto Solar, de 50,01 MW de potencia instalada, y sus infraestructuras de evacuación, en Valverde de Alcalá, Torres de la Alameda y Pozuelo del Rey (Madrid).
PFOT 206 Solar Photovoltaic Plant Driza Solar of 112.5 MWp as well as its associated evacuation infrastructures
PFOT 209 instalación fotovoltaica Ojeador Solar, de 59,02 MW de potencia instalada e infraestructura de evacuación
PFOT 239 Photovoltaic solar park Gran Fregacedos, with 133 MW of peak power and 111.8 MW of nominal power
PFOT 250 Photovoltaic solar installations, FV Sentina Solar, FV Perdiguero Solar and FV Zuncho Solar and their associated evacuation infrastructures
PFOT 268 Foque Solar photovoltaic installation, with an installed capacity of 112.5 MW, and its evacuation infrastructure
PFOT 417 AC Solar Photovoltaic Project “Helena Solar 1, of 99.9 MWp, Helena Solar 2, of 99.9 MWp, Helena Solar 3, of 49.9 MWp, Helena Solar 4, of 47.4 MWp, Helena Solar 5, of 43.4 MWp, Helena Solar 6, of 40.9 MWp, Helena Solar from 7 to 14 of 49.9 MWp and its evacuation infrastructures
PFOT 418 Photovoltaic installation Helena Solar 2, with 99.98 MW of peak power and 89.36 MW of installed power
PFOT 433 Photovoltaic installation La Sagra 1, of 200.1 MW of peak power and 195,024 MW of installed power
PFOT 448 Solar Photovoltaic Plant Mantia Solar 3, with 29.98 MW of peak power and 24.06 MW of installed power
PFOT 433-447-448 Joint evacuation of the Solar Photovoltaic Plants "La Sagra 1" (195.02 MWins; file: PFot-433) and "Mantia Solar 2" (109.98 MWins; file PFot-447) "Mantia 3" (24.06 MWins; Pfot-448)
PFOT-455 - Solar Photovoltaic Plant La Vaguada of 108 Mwp, Paramos de la Sagra of 117 Mwp, Hayabusa of 116 Mwp, San Marcos of 152 Mwp and San Pedro of 116 Mwp of installed power
PFOT-466---Solar-Photovoltaic-Guadarrama-de-108,758-MW-of-power-installed plant and its evacuation infrastructure. “Electric evacuation line "L/220 kV Guadarrama III-Buenavista REE (SC-Second Stretch)”.
PFOT-474 - Planta Solar Fotovoltaica AENA - Aeropuerto Madrid Barajas - de 142,42 Mwp de potencia instalada.
PFOT-490 - Solar Photovoltaic Plant ISF Ebisu of 111.56 MWp and Ebisu II of 164.84 MWp installed power
PFOT-499 - Planta Solar Fotovoltaica "Torrejón de Velasco I, II, III y IV" de 49,9 MWp / 42,60 MWn de potencia instalada
PFOT-549 - Planta Solar Fotovoltaica "Envatios XXIV, Fase I, II y III" de 70 MWn de potencia instalada
PFOT-572 - Photovoltaic Solar Plant "Yadisema Phase I and Zednemen Phases II and III" of 116.74 MWp of installed power
PFOT-573 - Photovoltaic Solar Plant "Yadisema Phase I and Zednemen Phases II and III" of 116.74 MWp of installed power
PFOT-580 - Photovoltaic Solar Plant "GR Martineta, GR Porron and GR Calamón" of 49.88 MWp of installed power
PFOT-583 - Photovoltaic Solar Plant "Carolina Solar PV and V Solar 1" of 300 MWp and 289 MWp installed power respectively
PFOT-598 - Photovoltaic Solar Plant "ISF Ebisu and Ebisu II" of 111.56 MWp and 164.84 MWp of installed power, respectively.
PFOT 622 Photovoltaic installations Villaviciosa Renobla I, Villaviciosa Renobla II and Villaviciosa Renobla III, of 51 MWp and 35.66 MWn
PFOT-711 - Photovoltaic Solar Plant "Carmina Solar 2" of 99.973 MWp and 97,011 MWn of installed power
PFOT-716 - Wind Farm "Alto del Castillo" with 36 MWp installed capacity, Solar Photovoltaic Plant "Olmazo" with 17.4 MWp and "El Parral" with 17 MWp installed capacity
PFOT-718 - Photovoltaic Solar Plant "Orión" of 50,747 MWp and "PSF Hércules" of 134,234 MWp of installed power
PFOT-719 - Photovoltaic Solar Plant "Orión" of 50,747 MWp and "Hércules" of 134,234 MWp of installed power
PFOT-720 - Photovoltaic Solar Plant "Oats, Rye and Wheat" of 50 MWp, 49.60 MWp and 40.40 MWp of installed power respectively
PFOT-723 - Solar Photovoltaic Plant "Envatios XXV and Envatios XIII - The Cereal Phase II of 183.8 MWn and 165.5 MWp of installed power respectively
PFOT 924 AC Plantas de Prad San Solre I, Prad San Solre II, Prad San Energias I y Prad San Energias II, Solre y EF Renovables
LAT 02/21 Project for the implementation of the new overhead power transmission line at 400 kV, double circuit, entrance and exit at the substation of Torrejón de Velasco of the power line at 400 kV Morata-Villaviciosa
LAT 01/22 Project of execution of the 400 kV park of the «San Fernando Substation 400/220 kV», in the municipality of San Fernando de Henares, province of Madrid
LAT 02/22 Extension of the Loeches substation in the 400 kV park, with a new position, in the municipality of Loeches
LAT 04/22 Extension of the Morata 400 kV substation, through two new positions, one line and one central, as well as another new reserve position, in Morata de Tajuña
LAT 05/22 Renovation of the ATP1 400/220 kV power autotransformer and installation of a new transformer centre for the tertiary of the Moraleja 400 kV substation, in the municipality of Moraleja de Enmedio
LAT 06/22 extension of the Moraleja substation, in the 400 kV park, for the new position 10 EVRE, and the new position 11 for the installation of a STATCOM, in the municipality of Moraleja de Enmedio
LAT 07/22 "Extension of the substation Anchuelo 400 kV New Reactance" with a new position of Reactance REA and the associated machine
LAT 08/22 Project for the Expansion of the Villaviciosa substation, in the 400 kV park, for the evacuation of renewables EVRE, in the municipality of Villaviciosa de Odón
LAT 01/23 Expansion of the 400 kV park of the Anchuelo substation, with two new positions (a new line exit position for evacuation of EVRE renewables and a new central switch position) in the municipality of Anchuelo
LAT 04/23 Bypass operable at the Morata 400 kV substation of the San Sebastián de los Reyes - San Fernando - Morata 400kV and Morata - Moraleja 400 kV axes to form the San Sebastián de los Reyes - San Fernando - Moraleja 400 kV axis
LAT 05/23 Extension of the Torrejón de Velasco substation in the 400 kV park, with a new position of Reactance REA and associated machine
LAT 08-23_New Airline M.T. 15 kV S/C close between the AVR709 VLS703 circuits, in Aranjuez (Madrid) and Yepes (Toledo).UFD Distribution Electricity S.A.
LAT 09/23 Project of implementation of the increase of the transport capacity of the overhead power transmission line to 400 kV, double circuit, Moraleja-Villaviciosa and Morata-Villaviciosa, with modification of the route, between support 115 and 135, in the municipal terms of Moraleja de Enmedio, Arroyomolinos and Móstoles, in the province of Madrid
LAT 11/23 Extension of the Fuencarral substation in the 400 kV park, with a new line exit position for the evacuation of renewables (EVRE) on street 3
LAT 12/23 Preliminary Design of the Overhead Power Transmission Line at 400 kV, Double Circuit, Belinchón-Morata