Municipal terms:
Province of Toledo:
Alameda de la Sagra, Borox, Esquivias and Seseña
Powers:
Valdemoro I, 50 MWp/47.86 MWinst
Valdemoro II, 50 MWp/47.86 MWinst
Holder: Laurum Soluciones, S.L., and Lix Solar, S.L.
Projects contained:
Photovoltaic installation Valdemoro I, 50 MWp/47.86 MWinst
Photovoltaic installation Valdemoro II, 50 MWp/47.86 MWinst
Evacuation infrastructure (Electrical Substation 30/220 kV, called "Alameda Solar 220 kV" and evacuation line 220 kV, called "Alameda Solar Evacuation")", in the municipal terms of Alameda de la Sagra, Borox, Pantoja, Esquivias and Seseña (Toledo).