Headline: EL CASTILLAR ENERGY, S.L.U. with C.I.F. No. B88239512, and address for notification purposes: Paseo Club Deportivo, block 13, floor 1, 28223, Madrid.
Facilities Description:
- The EL CASTILLALR Wind Farm, with a installed capacity of 71.5 MW, will be located in the municipal areas of Algora and Torremocha del Campo, also affecting El Sotillo and Mirabueno; the energy generated will be carried by underground lines at 30 kV to the collecting substation.
- Collection substation EL CASTILLAR 30/132 kV, located in Algora.
- The evacuation line at 132 kV, from the substation "El Castillar 30/132 kV" to the substation "Almadrones 132 kV", will run through the municipal areas of Algora, Mirabueno, Alaminos and Almadrones.
The Almadrones substation and the rest of the evacuation infrastructures up to the point of discharge in the SET Fuentes de la Alcarria 400 kV of REE are processed in other files.