Public Information Procedures
- EL CABEZO WIND FARM
- EL PORTILLO 2 WIND FARM
- ROMERALES WIND FARM 1
- ROMERALES WIND FARM 2
- VALDEJALÓN WIND FARM
- PUYLOBO WIND FARM
- FUENDEJALÓN WIND FARM
- Mina Muga (Aragon and Navarre)
- EXTENSION NORM INTERCUM
- Extension Norm ASICCAZA
- ROMERALES WIND FARM 1
- CONSTRUCTION PROJECT FOR THE ADAPTATION OF THE TRAIN LINE SAGUNTO TERUEL-ZARAGOZA FOR THE CIRCULATION OF TRAINS OF MERCHANDISE OF 750 M OF LENGTH
- TICO WIND PROJECT
- BASIC PROJECT OF ELECTRIC TRACTION SUBSTATIONS, SELF-TRANSFORMATION CENTERS AND HIGH-TENSION LINE FOR THE ZARAGOZA TERUEL SECTION OF THE CANTABRIAN-MEDITERRANEAN CORRIDOR. AREAS OF CARIÑENA AND VILLAFRANCA
- FORCED EXPROPRIATION DOSSIER 197ADIF1998 MOTIVATED BY THE WORKS OF THE "CONSTRUCTIVE PROJECT FOR THE ADAPTATION OF THE GA-TERUEL-ZARAGOZA LINE FOR THE CIRCULATION OF TRAINS OF MERCANCÍAS OF 750 M IN LENGTH", IN THE MUNICIPAL TERMS OF ESTIVELLA, ALBALAT DELS TARONGERS (VALENCIA), TERUEL, FERRERUELA DE HUERVA (TERUEL), YCARIÑENA (ZARAGOZA)
- CONSTRUCTION PROJECT OF THE ELECTRIC TRACTION SUBSTATIONS, SELF-TRANSFORMATION CENTERS AND HIGH VOLTAGE OVERHEAD LINE FOR THE ZARAGOZA TERUEL SECTION OF THE BAY OF BISCAY. AREAS OF CARIÑENA AND VILLAFRANCA
- PHOTOVOLTAIC INSTALLATIONS FORNAX I, FORNAX II AND FORNAX III
- PHOTOVOLTAIC INSTALLATIONS CENTAURUS IV, CENTAURUS V AND CENTAURUS VI
- IMPROVING THE SECURITY OF COMMUNICATIONS AT THE ZARAGOZA–HARO GAS PIPELINE
- “JALON 2050” WIND FARM PROJECT
- FORCIBLE EXPROPRIATION LINE SAGUNTO TERUEL-ZARAGOZA IN CARIÑENA (ZARAGOZA)
- PHOTOVOLTAIC INSTALLATION "SOLAR WHEEL"
- PHOTOVOLTAIC INSTALLATION "TERRER SOLAR"
- PHOTOVOLTAIC INSTALLATION "HIBERUS SOLAR"
- BIOTA WIND FARM
- ADIF REPAIR OF THE BRIDGE OVER THE MONEGRILLO RIVER
- PHOTOVOLTAIC INSTALLATION PFOT-456 AC “CLUSTER FV TERUEL MAESTRANZA”
- PHOTOVOLTAIC INSTALLATION “ALFAJARIN SOLAR PFot-151”
- WIND FARMS: VALENTUÑA of 100 NW, LORBES of 50 NW, WOLF JUMP of 100 NW, MIRAMÓN of 72 NW AND SANGORRÍN of 100 NW.PE ol-409 AC
- PHOTOVOLTAIC INSTALLATION PFot-285 “MUDEJAR”
- WIND FARM “MAESTR⦅<X_9/>⦆ _PEOL-449 AC CLUSTER”. 22PARKS
- PHOTOVOLTAIC INSTALLATION “MUEL”PFot-150
- PHOTOVOLTAIC INSTALLATION “FV PEÑAFLOR”Pot-147
- AERONAUTICAL EASEMENTS OF VARIOUS RADIO INSTALLATIONS FOR AIR NAVIGATION
- INSTALLATION WIND FARM DIANA and WINDS OF THE SOUTH. PEol 271-AC
- PHOTOVOLTAIC INSTALLATION “ABEDUL II NEW ENERGY”
- WIND INSTALLATION “San Cristobal, Pedrecha and Cabezuelas. PEol 250-AC”
- PHOTOVOLTAIC INSTALLATION “FV Fuendetodos PFot-444 of 124.92 MWp,”
- WIND INSTALLATION “Sáabas and Ejea. PEol PEol-390AC”
- “NEW AURIN COMPRESSION UNITS. UNDERGROUND STORAGE SERRABLO”, IN THE MUNICIPALITY OF SABIÑANIGO (HUESCA)
- WIND INSTALLATION "MUNO WIND FARM"
- DIRECT TRANSFER FROM THE PRIMARY TRANSPORT GAS PIPELINE “ZARAGOZA CALATAYUD” FOR THE DISTRIBUTION BRANCH TO MORÉS (Zaragoza Province)"
- PHOTOVOLTAIC INSTALLATION "JAIME I" (40 MWP) and WIND INSTALLATIONS: "EL PELADO" (38.5 MW), "HONOS" (49.5 MW), "LERA" (38.5 MW) AND "SAN VICENTE" (49.5 MW). “BEGUES_PFOT-539 AC CLUSTER”.
- Wind installations Taranis, Angus, Bodega, Brigid, Metis, Dian, Nazario, Fulgora, Belenus, Epona, Electra, Felis, Hefesto and Fontus, of 49.5 MW each. PEol-482-AC.
- CLUSTER 2 PEOL 280 AC. ARLO, ARGESTES, CÉFIRO AND PAUCALI WIND INSTALLATIONS
- PEol. 525. AC. INSTALACIONES EÓLICAS OMEGA, KAPPA, ÓRBITA, ÓMICRON, LAMBDA E IOTA, DE 49,5 MW CADA UNA
- PFot-597. ERSA PHOTOVOLTAIC INSTALLATION OF 49.46 MWP.
- PEol-577-AC. MAIA, VELA AND OCTANTE WIND INSTALLATIONS, OF 49.5 MW EACH
- WIND INSTALLATION PEol-493 AC “MELIDES AND OREADES”
- PEol_683 AC. PROXIMA CENTAURY AND STIGMA WIND INSTALLATIONS, OF 49 MW EACH
- PERFORMANCES ON THE ROOFS OF THE ZARAGOZA DELICIAS STATION
- PEOL_522_AC. AMIKIRI, BELEROFONTE, CADMO, DELFINO, FUKEI, KAEDE, KAIRI, KAMINARI, KODAMA, KYOKO, LUNA AND MAKAMI WIND INSTALLATIONS.
- PFot_677. UME photovoltaic installation.
- PFot_753_AC. PHOTOVOLTAIC INSTALLATIONS TARA and UMIKO
- PFot_678_AC. PHOTOVOLTAIC INSTALLATIONS TEBE and TELEFO
- PEOL-560 AC. WIND INSTALLATIONS ALCIONE, PROPUS, POLARIS AND AIN OF 49.5 MW EACH
- WIND INSTALLATION PEol-546 “Nereo”
- PEol-555. Wind installation ALTO DEL FRAILE
- PEol-628 AC. LACERTA WIND INSTALLATIONS OF 44 MW AND MARFIK OF 37.98 MW.
- PEol-563 AC. NEMBUS, OSA MENOR, SEXTANS AND LYRA WIND INSTALLATIONS OF 49.50 MW EACH.
- PEol-556. LUPUS WIND INSTALLATION OF 49.5 MW.
- WIND INSTALLATION PEol-547 AC “CANDELA, EREBO, HESTIA and PERSEFONE”
- PEol-712 AC. 24 MW ROBIGUS wind power plants, 30 MW QUIRITE, 42 MW PROVIDENTIA, 42 MW PROMITOR, 48 MW RELOANO, 42 MW PRIAMO, 33.5 MW PIETAS and 48 MW OTHAR.
- PEol-593_AC. Wind installations IKUSA, IMA, INARI, IZANAGI, HOTEI, HECTOR, GAKI, INAGUMI, FUYU, INO and their evacuation infrastructures, in the province of Zaragoza.
- PFot-683 AC. Photovoltaic installations MANTO Y LAMOS of 53,596 MWp each
- PFot-727 AMALTEA. Photovoltaic installation of 56.92 MWp.
- PFOT-733 AC. TELEMACO,TOKI AND UKARA PHOTOVOLTAIC INSTALLATIONS OF 49.48 MWP/45.84 MWINS EACH.
- PEOL-614 AC. MUKA, MIRA, MIZAR, NARA, NARUMI AND RAI WIND INSTALLATIONS IN THE PROVINCE OF ZARAGOZA
- PEol-617_AC. Wind installations ONI, NORI, NUE, ORICHI, PORTIA, PRIMA, PLEITONE, ORESTES, PARIS, QUIMERA and RAIJIN in the province of Zaragoza.
- PEol-627 AC NORMA AND OSA MAYOR
- PEol-571 AC SEGIN, LEONIS, MENKAR, MENSA, RASALAS, MERAK and LICH
- PFot-631 AC. AVIOR AND ATRIA PHOTOVOLTAIC INSTALLATIONS OF 56.63 MW EACH
- PEOL-725 AC. AIKO AND ATREO WIND INSTALLATIONS IN THE PROVINCES OF ZARAGOZA AND NAVARRA
- PEOL-722 AC. WIND INSTALLATIONS KENEO, KAORI, KARI, KASUMI, KEIKO AND KIRIN IN THE PROVINCES OF ZARAGOZA, NAVARRA AND LA RIOJA
- EXTENSION OF THE TERRER 400 KV SUBSTATION
- WIND INSTALLATION PEol-551 AC “KAREN and TEMPLARIO”
- PEOL-662 AC. TEREBELLUM, ALNITAK, CORDELIA, MINTAKA, VOLANS AND CUJAM WIND INSTALLATIONS OF 49.5 MW EACH.
- PEol-663 AC. ZIBAL, ALMAZ, GOMEISA, LYNX, FULU, TEJAT AND ZOSMA WIND INSTALLATIONS OF 49.5 MW EACH
- PFOT-702. PHOTOVOLTAIC INSTALLATION CRESIDA OF 34.31 MWp / 28.60 MWn
- PFOT-703. DENEB PHOTOVOLTAIC INSTALLATION OF 34.31 MWp / 28.60 MWn
- PFOT-704. ENIF PHOTOVOLTAIC INSTALLATION OF 34.31 MWp / 28.60 MWn
- PEOL-540_AC. WIND INSTALLATIONS CERBERO, MENECIO, OALAS, PERSES, ODISEO, SELENE AND CRETON OF 49.5 MW EACH.
- PEOL-637 AC. TAU, SIGMA, TEOREMA, PERSEUS, ESCUDO, PAVO, FORNAX, SUPERELIPSE, ORION AND SARIN WIND INSTALLATIONS, 49.5 MW EACH, 16 MW PICTOR AND 25.25 MW HADAR.
- PFOT-701 AC. PHOTOVOLTAIC INSTALLATIONS ALYA OF 54.25 MWp AND ATIK OF 14.74 MWp
- PEOL-731 AC. WIND INSTALLATIONS SECRETARIAT OF 42 MW AND SECURITA OF 48 MW.
- PEOL-634 AC. LEO and OFFICUS WIND FARMS OF 49.5 MW EACH
- PFOT-698 AC. BATEN, BIANCA AND CANOPUS PHOTOVOLTAIC INSTALLATIONS OF 56.92 MWp EACH
- NEW ELECTRIC SUBSTATION AND AERIAL TRANSPORT LINE ALMENDRALES 400 KV. T.M. OF MEQUINENZA.
- PEOL-652 AC. NAOS, OGMA, PISCES, REGULUS, MIRAM, RIGEL, PEGASUS AND RASTABAN WIND INSTALLATIONS OF 49.5 MW EACH
- PFOT-779 AC. PHOTOVOLTAIC INSTALLATIONS VULVEZ OF 41.96 MWp/39.29 MWins, TANUKI OF 46.45 MWp/44.2 MWins and zetes of 46.45 MWp/44.2 MWins.
- PFOT-759. USSIA PHOTOVOLTAIC INSTALLATION OF 50.01 MW
- EXTENSION OF THE SUBSTATION FUENDETODOS 400 KV ON THE T.M. OF MEQUINENZA.
- PEOL-677 AC. WIND INSTALLATIONS WEZEN, TAURUS, RAN, TABIT, TELESCOPIUM, VEGA AND VIRGO OF 49.5 MW EACH.
- PEOL-729 AC. INSTALACIONES EÓLICAS SALUS DE 42 MW, SARITOR DE 18,25 MW, SANCUS DE 48 MW, RUMINA DE 48 MW, RUSOR DE 30 MW, RUNCIA DE 24 MW Y SALACIA DE 42 MW
- PEOL-757 AC. WIND INSTALLATIONS REDARATOR OF 42 MW, RESO OF 48 MW AND RIFEO OF 30 MW.
- PEOL-659 AC WIND INSTALLATIONS MUSCA, MERIDIANA, ROTANEV, SAGITARIO, SARGAS, MEROPE, SIRIUS, SUBRA AND LIBRA OF 49.5 MW EACH.
- EXTENSION OF GAUGE IN TUNNELS AND UPPER PASSAGES OF LINE 610
- PFOT-321. SOLAR TERRER PHOTOVOLTAIC INSTALLATION OF 130 MWp / 124.72 MWn / 107.5 MWac
- PEOL-687 AC. WIND INSTALLATIONS AES OF 30 MW, AELO OF 36 MW, CALASI OF 42 MW, AEQUITAS OF 36 MW, ARVALES OF 42 MW, AUGUR OF 42 MW, ALBUENA OF 36 MW, ANTEO OF 36 MW, ARETE OF 42 MW, AXILO OF 42 MW, CARCLIMA OF 30 MW, INSITOR OF 36 MW, HALIO OF 24 MW AND CANDELARIA OF 36 MW.
- ADIF - CONSTRUCTION OF ACOUSTIC PROTECTIONS
- PFOT-322 PHOTOVOLTAIC INSTALLATION SOLAR WHEEL OF 292 MWp / 290.47 MWn / 260 MWac
- PEOL-740 AC. 42 MW NAPEAS WIND INSTALLATIONS, 42 MW LAZLOS, 48 MW DEXITEA, 30 MW KELPIE, 42 MW INCITATUS, 48 MW BAYARD, 48 MW BURAQ and 30 MW GRANI
- PEOL-750 AC. SUKI 49.5 MW, SUZAKU 42.2 MW WIND POWER PLANTS ARE 49.5 MW, SIRIUS 49.5 MW, SAYA 49.5 MW, RYU 49.5 MW, SABIK 49.5 MW and SAKURA 49.5 MW.
- PFOT-790 AC. TRIVIA 45.04 MWp/42.56 MWins PHOTOVOLTAIC INSTALLATION AND 76.61 MW TROYL HYBRIDIZATION GENERATION PLANTS (49.52 MWp/46.61 MWins PHOTOVOLTAIC TECHNOLOGY AND 30 MW WIND TECHNOLOGY) AND TULPAR 50.49 MW (34.52 MWp/32.49 MWins PHOTOVOLTAIC TECHNOLOGY AND 18 MW WIND TECHNOLOGY).
- PERFORMANCES ON THE ROOFS OF THE ZARAGOZA DELICIAS STATION.
- PEOL-432 JALON 2050 WIND INSTALLATION OF 100 MW.
- PEOL-758. BUCEPHALOUS WIND INSTALLATION OF 30 MW.
- PEOL-753 AC. AZAMI WIND INSTALLATIONS OF 49.5 MW, ARTURO OF 49.5 MW, ATALÁN OF 49.5 MW and BASÁN OF 49.5 MW.
- PEOL-785. 42 MW of QUIRINO WIND POWER PLANT
- PEOL-784 AC. SICIÓN wind power plant of 48 MW and SILVANO of 42 MW.
- PEOL-760. WIND INSTALLATION TAGES OF 42 MW.
- PEOL-722 AC. 49.5 MW KENEO, 49.5 MW KAORI, 49.5 MW KARI, 49.5 MW KASUMI, 27.5 MW KEIKO AND 27.33 MW KIRIN WIND INSTALLATIONS.
- PEOL-783 AC. MELEAGRO WIND INSTALLATIONS OF 49.5 MW and KITSUNE of 49.5 MW.
- PFOT-815 AC. PHOTOVOLTAIC INSTALLATIONS TANIA OF 49.52 MWp / 41.25 MWn, URSA OF 49.52 MWp / 41.25 MWn, TARPEYA OF 20.87 MWp / 17.37 MWn, TARQUECIO OF 38.52 MWp / 32.08 MWn AND YUKIKO OF 49.52 MWp / 41.25 MWn
- PEol-196. 180 MW of Tico wind power plant and its evacuation infrastructure in the province of Zaragoza.
- EXTENSION OF THE 400KV MAGELLOON SUBSTATION
- PEOL-784 AC test. SICIÓN wind power plant of 48 MW and SILVANO of 42 MW.
- PEOL-FV 078. INSTALACION DE GENERACION HÍBRIDA HIB CTCC ESCATRÓN DE 764,2 MWINS / 274,6 MWN
- EXTENSION OF THE FUENDETODOS 400/220KV SUBSTATION
- MODIFICACIÓN DE LA LÍNEA AÉREA DE TRASPORTE DE ENERGÍA ELÉCTRICA A 220 KV, SIMPLE CIRCUITO, DENOMINADA “POBLA - T DE SESUE”
- PEOL-821. SANJOSÍAS WIND INSTALLATION OF 105.4 MW.
- PEOL-555.INSTALACiHIGH WIND FARM OF 44 MW.
- PEOL-765 AC. ESTENTOR OF 49.5 MW, ENEAS OF 33 MW, LIBITINE OF 49.5 MW, SCILLA OF 49.5 MW, LEVANA OF 38.5 MW, LAYO OF 49.5 MW, FAVONIO OF 49.5 MW, MANTUS OF 38.5 MW, MEPHITIS OF 33 MW, MELITEO OF 49.5 MW, MESOR OF 27.5 MW, LUCINA OF 38.5 MW, MONETA OF 49.5 MW, MEGES OF 49.5 MW, MELLONA OF 49.5 MW, MINERVA OF 49.5 MW, MENELAO OF 27.5 MW, MATUTA OF 38.5 MW AND FASUEL’S INFRASTRUCTURES,
- EXTENSION OF THE ESCATRÓN 400 KV SUBSTATION
- PFOT-807 AC. PHOTOVOLTAIC INSTALLATIONS LARENTINA OF 39.99 MWins / 35.4 MWn, INUS OF 20.81 MWins / 18.4 MWn AND LADON, OF 39.99 MWins / 35.4 MWn AND ITS EVACUATION INFRASTRUCTURES IN THE PROVINCES OF TERUEL, CASTELLÓN AND VALENCIA.
- PEOL-FV-043 AC. TACIO, SUMANUS, SUADELA, SORANUS AND SILVER WIND INSTALLATIONS, OF 30 MW EACH, AND THEIR HYBRIDIZATION WITH THEIR RESPECTIVE PHOTOVOLTAIC PLANTS, OF 21.43 MWP/19.52 MWINS EACH.
- PEOL-204. LAS MAJAS WIND FACILITY OF 99 MW
- EXTENSION OF GAUGE IN TUNNELS AND UPPER PASSAGES OF LINE 610
- PFOT-704 ENIF PHOTOVOLTAIC INSTALLATION OF 32.27 MWins
- PFOT-588 HEZE PHOTOVOLTAIC INSTALLATION OF 42.48 MWins AND ITS EVACUATION INFRASTRUCTURE IN THE PROVINCE OF HUESCA
- INTEGRAL REMODELING OF THE GRASSEN STATION
- EXTENSION OF ROADS STATIONS OF SOURCES OF EBRO AND THE TOWN OF HIJAR
- EXTENSION OF THE MAGELLAN 400 KV LA SERNA 2 AND 3 SUBSTATION
- ELECTRIC POWER TRANSMISSION OVERHEAD LINE, DOUBLE CIRCUIT AT 400 KV, MOSQUE - PLATEA, LOCATED IN THE PROVINCE OF TERUEL
- ELECTRIC POWER TRANSMISSION OVERHEAD LINE AT 400 KV, DOUBLE CIRCUIT, LA SERNA – MAGELLAN
- PFOT-285 PHOTOVOLTAIC INSTALLATION MUDEJOF 64,188 MW.
- Construction project for the extension of section roads up to a useful length of 750 m in stations of the Zaragoza - Tarragona section by Caspe. Stations of Chiprana and Nonaspe"
- Construction project of the Algeciras-Zaragoza Railway Highway. Upper steps of the stretch: Santa María de Huerta (P.K. 194,6) - Needle 25 (P.K. 336,363). Province: Zaragoza
- PEOL-470. LÉCERA WIND INSTALLATION OF 179.8 MW
- PFOT-154. FORNAX I 110.98 MWp/108.79 MWINS PHOTOVOLTAIC INSTALLATION
- PFOT-155. 115 MWp/111.32 MWINS FORNAX II PHOTOVOLTAIC INSTALLATION
- PFOT-156. 107.33 MWp/106.26 MWINS FORNAX III PHOTOVOLTAIC INSTALLATION
- PEOL-449 AC. CLUSTER MAESTRANCIA WIND INSTALLATIONS, COMPOSED OF 20 PARKS AND A TOTAL OF 727.10 MW.
- PFOT-456 AC. INSTALACIONES FOTOVOLTAICAS MASIA I Y MASIA II DE 41,25 MW CADA UNA.
- PFOT-444. FUENDETODOS 124.92 MWP/98.22 MWINS PHOTOVOLTAIC PLANT
- PFOT-144. 104.5 MWp/83.6 MWINS CENTAURUS IV PHOTOVOLTAIC INSTALLATION
- PFOT-145. PHOTOVOLTAIC INSTALLATION CENTAURUS V OF 104.5 MWp/83.6 MWINS
- PFOT-146. 104.5 MWp/83.6 MWINS CENTAURUS VI PHOTOVOLTAIC INSTALLATION
- PEOL-246. BRAVE WIND INSTALLATION II OF 88.4 MW.
- PFOT-147. PEÑAFLOR 136.49 MWP/113.42 MWINS PHOTOVOLTAIC PLANT
- PEOL-253. 49.5 MW WIND FARM CABEZUELAS
- PEOL-841. 86.72 MW WIND POWER PLANT LOS SARMIENTO
- TUNNELS "CASTILLO", "EL RINCÓN", "PORTILLEJO", "BUBIERCA", "LA ROMERA", "TOBA" AND "ATECA"
- PEOL-FV-118. PHOTOVOLTAIC PLANT “LAS MAJAS VII A” OF 10.89 MWINS FOR ITS HYBRIDIZATION WITH THE EXISTING WIND FARM “LAS MAJAS VII A” OF 49.40 MWINS, AND ITS EVACUATION INFRASTRUCTURE
- PEOL-FV-119. PHOTOVOLTAIC PLANT “LAS MAJAS VII B” OF 10.89 MWINS FOR ITS HYBRIDIZATION WITH THE EXISTING WIND FARM “LAS MAJAS VII B” OF 49.40 MWINS, AND ITS EVACUATION INFRASTRUCTURE.
- PEOL-FV-120. PHOTOVOLTAIC PLANT “LAS MAJAS VII C” OF 10.89 MWINS FOR ITS HYBRIDIZATION WITH THE EXISTING WIND FARM “LAS MAJAS VII C” OF 49.40 MWINS, AND ITS EVACUATION INFRASTRUCTURE.
- PEOL-FV-121. PHOTOVOLTAIC PLANT “LAS MAJAS VII D” OF 24.25 MWINS FOR ITS HYBRIDIZATION WITH THE EXISTING WIND FARM “LAS MAJAS VII D” OF 49.40 MWINS, AND ITS EVACUATION INFRASTRUCTURE
- TERRAPLÉN 'LA MARGA STABILIZATION PROJECT
- "NOISE PROTECTION PROJECT RESULTING FROM NOISE ACTION PLANS. PHASES I AND II. AREA NO. 2 NORTH AREA: BASQUE COUNTRY, ASTURIAS, ARAGON AND CASTILLA Y LEÓN. AREA NO. 5 METRIC WIDTH NETWORK: ASTURIAS AND CANTABRIA”
- CCC-002 SAURUS PHOTOVOLTAIC INSTALLATION OF 137.03 MWn and 155.10 MWp
- TUNNELS “LA ANCHADA”, “RIBOTA”, “LA PLANILLA”, “ZADALLOS”, “LOS SANTOS”, “SAN JOSÉ”, “EMBID”, “VILLANUEVA”, “PEÑA DE LA VIUDA”, “EL ESTRECHUELO” AND “ARAPIEL”
- DRAINAGE CONDITIONING AND IMPROVEMENT PP.KK. 211+000 AL 224+000. NORTHEAST AXIS. SECTION 2.A.
- PEOL-FV-ALM-018. PHOTOVOLTAIC INSTALLATION THE FLAT OF 45 MWINS AND 5 MWINS OF A STORAGE MODULE WITH ENERGY INJECTION TO THE GRID, FOR ITS HYBRIDIZATION WITH THE EXISTING WIND FARM THE FLAT OF 49.95 MWINS, AND ITS EVACUATION INFRASTRUCTURE
- PEOL-851. 105.4 MW FLORIN WIND FACILITY AND ITS EVACUATION INFRASTRUCTURE
- ADAPTATION OF THE TUNNELS OF THE CONVENTIONAL NETWORK OF THE NORTH-EAST SUB-DIRECTORATE OF OPERATIONS
- LAAT AT 220 kV SE MEDIUM-SE PONT DE SUERT.
- INTEGRAL REMODELING OF THE GRASSEN STATION
- EXTENSION OF SECTION TRACKS TO CHIPRANA AND NONASPE STATIONS
- PEOL-FV-ALM-020 AC. HYBRID FACILITIES HB1 SAN MARTÍN OF 454.37 MWins, HB2 LA PLANA OF 183.04 MWins, HB3 ÍTACA OF 124.54 MWins, HB4 LA MASADA OF 152.84 MWins, HB5 OTORLO OF 537.79 MWins, HB6 THE DRUM OF 132.3 MWins and HB7 PITARRA OF 259.23 MWins, AND ITS EVACUATION INFRASTRUCTURE IN THE PROVINCES OF TERUEL AND ZARAGOZA.
- EXTENSION OF SECTION TRACKS FROM EBRO FOUNTAIN STATIONS
- PEOL-FV-ALM-015. SOLAR PHOTOVOLTAIC AND STORAGE PLANT PICADOR OF 45 MWINS OF PHOTOVOLTAIC TECHNOLOGY AND 5 MWINS OF STORAGE WITH POWER SUPPLY TO THE NETWORK, FOR ITS HYBRIDIZATION WITH THE EXISTING WIND FARM PICADOR OF 50 MWINS, AND ITS EVACUATION INFRASTRUCTURE
- PEOL-FV-ALM-017. SOLAR PHOTOVOLTAIC AND STORAGE PLANT THE TILES OF 45 MWINS OF PHOTOVOLTAIC TECHNOLOGY AND 5 MWINS OF STORAGE WITH POWER SUPPLY TO THE NETWORK, FOR ITS HYBRIDIZATION WITH THE EXISTING WIND FARM THE TILES OF 46 MWINS, AND ITS EVACUATION INFRASTRUCTURE
- PEOL-FV-ALM-013. SOLAR PHOTOVOLTAIC AND STORAGE PLANT EL TOLLO OF 45 MWINS OF PHOTOVOLTAIC TECHNOLOGY AND 5 MWINS OF STORAGE WITH POWER SUPPLY TO THE GRID, FOR ITS HYBRIDIZATION WITH THE EXISTING WIND FARM EL TOLLO OF 50 MWINS, AND ITS EVACUATION INFRASTRUCTURE
- PEOL-FV-ALM-002. SOLAR PHOTOVOLTAIC AND STORAGE CENTER VALDEJALON OF 45 MWINS OF PHOTOVOLTAIC TECHNOLOGY AND 5 MWINS OF STORAGE WITH POWER SUPPLY TO THE GRID, FOR ITS HYBRIDIZATION WITH THE EXISTING WIND FARM VALDEJALON OF 50 MWINS, AND ITS EVACUATION INFRASTRUCTURE
- PEOL-FV-ALM-019 SAN JORGE WIND FARM AND STORAGE WITH BESS MUDÉJAR BATTERIES OF 75 MWINS AND 42 MWINS RESPECTIVELY, AND ITS EVACUATION INFRASTRUCTURE, FOR ITS HYBRIDIZATION WITH THE EXISTING MUDÉJAR PHOTOVOLTAIC PARK OF 64,188 MWINS
- PEOL-FV-167. PHOTOVOLTAIC SOLAR PLANT “HYBRIDISATION BELCHITE” OF 13.5 MWINS AND ITS EVACUATION INFRASTRUCTURE, FOR ITS HYBRIDISATION WITH THE EXISTING WIND FARM BELCHITE OF 47.85 MWINS
- EXTENSION OF APARTMENTS TO 750M IN THE STATIONS OF PARACUELLOS - SABIÑÁN, MORÉS AND ÉPILA
- PEOL-482 AC. ANGUS, BRIGID, DIAN, FELIS, FONTUS, FULGORA, ELECTRA, BELENUS WIND FARMS OF 49.5 MW EACH AND EPONA OF 49 MW, AND THEIR EVACUATION INFRASTRUCTURE
- ALGECIRAS RAILWAY MOTORWAY - ZARAGOZA. TUNNELS. MUNICIPAL TERMS OF CALATAYUD AND MORATA DEL JALÓN (ZARAGOZA)
- ALGECIRAS RAILWAY MOTORWAY - ZARAGOZA. UPPER STEPS. MUNICIPALITY OF ATECA
- EXTENSION OF THE 400KV ESCATRON SUBSTATION WITH A NEW ELS AUBALS LINE POSITION
- MODIFICATION OF THE AIR POWER TRANSMISSION LINE OF THE MOSQUE – PLATEA, IN THE PROVINCE OF TERUEL (SECTION BETWEEN SUPPORTS T-46 AND T-49).
- PFOT-ALM-037 BATTERY STORAGE FACILITY “BESS HYBRIDISATION FV TERUEL”, OF 27.64 MW OF INSTALLED CAPACITY, AND ITS ASSOCIATED EVACUATION INFRASTRUCTURE IN THE MUNICIPALITY OF AZAILA, PROVINCE OF TERUEL, FOR HYBRIDISATION WITH THE EXISTING PHOTOVOLTAIC SOLAR PARK “FV TERUEL”, OF 42.56 MW.
- ELECTRIFICATION OF THE ZARAGOZA TERUEL-SAGUNTO LINE. STROKER-TERUEL SECTION. AIRLINE OF CONTACT
- PFOT-539 AC. PHOTOVOLTAIC INSTALLATION JAIME I, WIND INSTALLATION SAN VICENTE, WIND INSTALLATION LERA AND WIND INSTALLATION HONOS OF 174,7MWINS AND ITS EVACUATION INFRASTRUCTURE UP TO SET BEGUES 400.
- PEol-959 AC. CATALINA PROJECT FOR ELECTRICITY GENERATION FOR SELF-CONSUMPTION WITHOUT SURPLUSES, COMPRISING 7 WIND FARMS OF 897.60 MWins, 6 PHOTOVOLTAIC SOLAR PARKS OF 729.56 MWins, ITS EVACUATION INFRASTRUCTURE TO THE GREEN HYDROGEN PRODUCTION PLANT, AND THE CONNECTION LINE OF 400 KV FOR DEMAND, IN THE PROVINCE OF TERUEL.
- PROJECT OF CONSTRUCTION OF THE RAILWAY HIGHWAY ALGECIRAS - ZARAGOZA. TUNNELS
- PEOL-FV-180. LATE PHOTOVOLTAIC PARK I, OF 49.4 MWINS, AND ITS EVACUATION INFRASTRUCTURE IN THE PROVINCE OF HUESCA, FOR ITS HYBRIDIZATION WITH THE EXISTING WIND PARK LATE I, OF 49.5 MWINS.
- PEOL-FV 078. MODIFICATION OF THE FILE CALLED “MODIFICATION OF THE CTCC ESCATRÓN GENERATION FACILITY OF 282.2 MW GROSS POWER AND 274.6 MW NET POWER, WITH THE INCORPORATION OF 5 RENEWABLE ENERGY GENERATION MODULES AND THEIR EVACUATION FACILITIES, LOCATED IN THE PROVINCE OF ZARAGOZA
- PROJECT OF EXPANSION OF GALIBO IN TUNNELS OF LINE 610 STRETCH: ZARAGOZA - TERUEL.
- MODIFICATION OF THE LAAT AT 220 kV MEDIUM-PONT DE SUERT IN EL, STRETCH Ap21 and Ap 23
- EXPANSION OF THE PLATEA SUBSTATION IN THE PARK OF 400 KV AND THE NEW SINGLE CIRCUIT ELECTRIC POWER TRANSPORT OVERHEAD LINE TO 400 KV SE MISION -SE PLATEA, IN THE PROVINCE OF TERUEL.
- PFOT-588. HEZE PHOTOVOLTAIC INSTALLATION OF 42,48 MWins
- PFOT-597. ERSA PHOTOVOLTAIC INSTALLATION OF 49.46 MWins
- PROJECT OF DIRECT DERIVATION OF THE GAS PIPELINE ZARAGOZA – CALATAYUD FOR INJECTION OF BIOMETHANE IN THE MUNICIPALITY OF CALATORAO (ZARAGOZA)
- AERIAL AND UNDERGROUND ELECTRIC POWER TRANSMISSION LINES AT 220 KV ENTRANCE AND EXIT AT FORADADA SUBSTATION – “MEDIUM-PONT DE SUERT LINE”, AND “FORADADA-POBLA LINE”, IN THE PROVINCE OF HUESCA.
- P.K.-level Stoppage Project 205/295 FROM THE MADRID-BARCELONA.MUNICIPALITY OF ARIZA (ZARAGOZA).
- GALIBO EXTENSION PROJECT IN UPPER STEPS OF LINE 610 STRETCH: ZARAGOZA - TERUEL
- PEol-525 AC comprising the Wind Farms, PEol-525 Omega of 49 MW of installed power, PEol-526 Kappa of 42 MW of installed power, PEol-527 Orbit of 42 MW of installed power, PEol-528 Omicron of 21 MW of installed power, PEol-529 Lambda of 35 MW of installed power and PEol-530 Iota of 49.5 MW of installed power, and its evacuation infrastructures, in the provinces of Huesca and Lleida.
- PEOL-FV-161, HYBRID PLANT “RÍOS FV PROJECT”, WITH 36 MW OF INSTALLED PHOTOVOLTAIC POWER AND 30.5 MW OF WIND POWER
- MODIFICATION OF THE PROJECT “NEW COMPRESSION UNITS OF AURIN. UNDERGROUND STORAGE SERRABLO”, IN THE T.M. DE SABIÑÁNIGO (HUESCA).
- PEOL-FV-168. PHOTOVOLTAIC SOLAR PLANT “HERRERA DE LOS NAVARROS” OF 21 MWINS AND ITS EVACUATION INFRASTRUCTURE, FOR ITS HYBRIDIZATION WITH THE EXISTING WIND FARM HERRERA DE LOS NAVARROS OF 35 MWINS
- PEOL-253. 60 MWINS WIND FARM AND ITS EVACUATION INFRASTRUCTURES, IN THE PROVINCES OF SORIA AND ZARAGOZA
- ELECTRIC POWER TRANSMISSION OVERHEAD LINE AT 400 KV, DOUBLE CIRCUIT, PLATEA-REQUENA, IN THE PROVINCE OF TERUEL, VALENCIA AND CUENCA.
- PROJECT OF STABILIZATION OF TERRAPLÉN "LA MARGA" municipal terms MALLÉN and NOVILLAS (Zaragoza).
- EXTENSION OF THE PEÑAFLOR SUBSTATION TO INSTALL A NEW 400/220KV TRANSFORMATION BENCH AND EXTENSION OF THE 400KV PARK IN THE PROVINCE OF ZARAGOZA.
- PEOL-932 AC WIND INSTALLATIONS SIGFRIDA DE 14.86 DE MWINS, SIGRUN DE 14.86 MWINS, SUEVA DE 14.86 MWINS, BRUNILDA DE 14.86 MWINS, HERVOR DE 14.86 MWINS AND MIST DE 14.86 MWINS AND THEIR EVACUATION INFRASTRUCTURES, IN THE PROVINCES OF HUESCA, LLEIDA AND TARRAGONA.
- PROJECT OF SUPPRESSION OF STEPS AT THE LEVEL OF THE PP.KK. 251/045 AND 252/039 OF THE MADRID CHAMARTÍN CONVENTIONAL NETWORK LINE - BARCELONA ESTACIÓ DE FRANÇA. MUNICIPALITY OF CALATAYUD (ZARAGOZA)
- PFOT-1136 AC. PHOTOVOLTAIC INSTALLATIONS BOR OF 22.92 MWins, OLRUN OF 22.92 MWins, UROR OF 27.83 MWins, BERYLLIUM OF 29.47 MWins AND ITS EVACUATION INFRASTRUCTURES IN THE PROVINCE OF HUESCA.
- PFot-1144 AC. ATRIA PHOTOVOLTAIC INSTALLATIONS OF 32.74 MWins, AVIOR OF 32.74 MWins and GONDUL OF 22.92 MWins AND ITS EVACUATION INFRASTRUCTURES IN THE PROVINCE OF HUESCA.
- PFOT-1140 AC. GLEN PHOTOVOLTAIC INSTALLATIONS OF 19.64 MWins, BURI OF 22.92 MWins, KARA OF 22.92 MWins, MAGNETIC OF 22.92 MWins AND ITS EVACUATION INFRASTRUCTURES IN THE PROVINCE OF HUESCA.
- IT IS A REVERSIBLE HYDROELECTRIC POWER PLANT FOR LIVESTOCK FARMERS, WITH 95 MW IN TURBINES AND 110 MW IN PUMPING, WITH INSTALLED POWER AND FOR ITS EVACUATION INFRASTRUCTURE, IN THE MUNICIPAL AREAS OF LA MUELA AND ZARAGOZA, IN THE PROVINCE OF ZARAGOZA.
- PFOT-1117 SOLAR PHOTOVOLTAIC PLANT LOS VIENTOS I WITH A POWER OF 66.42 MWINP AND 54.60 MWINS, AND ITS EVACUATION INFRASTRUCTURE IN THE PROVINCE OF ZARAGOZA
- CONSTRUCTIVE PROJECT OF EXTENSION OF APARTMENTS TO 750 M IN THE STATIONS OF PARACUELLOS - SABIÑÁN, MORÉS AND ÉPILA
- PFOT-1134 NAVALLO I PHOTOVOLTAIC INSTALLATION OF 115 MW.
- EXTENSION OF THE MAGALLÓN SUBSTATION IN THE PARK OF 400/220 KV TO INSTALL A NEW 400/220KV TRANSFORMATION BENCH IN THE PROVINCE OF ZARAGOZA.
- ELECTRIFICATION PROJECT OF THE JACA 2 AND JACA 17 COMPRESSION SYSTEM. UNDERGROUND STORAGE SERRABLO”, IN THE T.M. DE JACA (HUESCA)