Electrical installations - Renewables
- PEOL-459 LABRAZA Wind Farm of 40 MW and its evacuation infrastructure
- PFOT-1042 EKIENEA Solar Photovoltaic Plant of 107.6 MW installed and its evacuation infrastructure
- ST ABANTO 400 kV expansion with a new switch position
- ELECTRICITY INTERCONNECTION SPAIN-FRANCE BY THE GULF OF BIZKAIA
- PEOL-852 Wind Farm “Itsaraz” of 60.4 MW and its associated infrastructures
- PFOT-1124 Photovoltaic Solar Plant “Santurce Solar 1” of 49,895 MW and its evacuation infrastructure.
- Addendum to the project of renovation of the electric power transmission line to 220 kV, simple circuit, Arkale-Argia, T31-Frontera section.
- Expansion of the Abanto Substation 400 kV, with a new position on 4th Street
- EXTENSION OF THE GATIKA 400 KV SUBSTATION, WITH A NEW POSITION ON 2ND STREET