PFot-815 AC. Photovoltaic installations Tania of 49.52 MWp, Ursa of 49.52 MWp, Tarpeya of 20.87 MWp, Tarquecio of 38.52 MWp and Yukiko of 49.52 MWp, and its evacuation infrastructure in the provinces of Zaragoza, Teruel, Castellón and Valencia.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Tauste (Zaragoza).
- Evacuation infrastructure: Tauste, Luceni, Pedrola, Rueda de Jalón, Plasencia de Jalón, Lumpiaque, Épila, Lucena de Jalón, Calatorao, Alfamen, Almonacid de la Sierra, Cosuenda, Aguarón, Cariñena, Encinacorba, Villarreal de Huerva, Mainar, Viladoz, Badules and Romans (Zaragoza); Villahermosa del Campo, Cucalón, Ferreruela de Huerva, Calongorera
Power: 207.95 MW.
Holder: Project promoted by Energía Inagotable de Tania, S.L., Inexhaustible Energy of Ursa, S.L., Inexhaustible Energy of Tarpeya, S.L., Inexhaustible Energy of Tarquecio,S.L. and Inexhaustible Energy of Yukiko, S.L. Being Inexhaustible Energy of Tania, S.L. The promoter that represents all the mercantiles.
Projects contained:
- Photovoltaic installation Tania of 49.52 MWp.
- Ursa photovoltaic installation of 49.52 MWp.
- Tarpeya photovoltaic installation of 20.87 MWp.
- Tarquecio photovoltaic installation of 38.52 MWp.
- Yukiko photovoltaic installation of 49.52 MWp.
- Evacuation infrastructure:
Electrical Substation SET Tauste G4 Photovoltaic 132/30 kV.
Airline 400 kV LAAT Gaussa 400 that goes from the SET Tauste G4 Photovoltaic to Apoyo Muela, of 146,6153 km in length.
Electric substation SET Tauste G4 400/132/30 kV.
Línea aérea de 400 kV LAAT 400 kV Apoyo Muela – SET Promotores Gaussa – SET Gaussa 400, de 39 km de longitud.
Electrical Substation SET Promoters Gaussa 400/30 kV.
The rest of the shared evacuation infrastructure is included in the PFot-753 AC, PEol-731 AC and PFot-807-AC files.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement: