PFot-753 AC. Photovoltaic installations Tara of 25.69 MWp and Umiko of 49.5 MWp, and its evacuation infrastructure in the provinces of Zaragoza, Navarra, La Rioja, Álava and Burgos.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Tauste (Zaragoza).
- Evacuation infrastructure: Tauste, Gallur, Novillas, Mallén and Fréscano (Zaragoza); Cortes, Ribaforada, Ablitas, Fontellas, Tudela, Cascante, Murchante and Corella (Navarre); Alfaro, Aldeanueva de Ebro, Autocrat, Arnedo, Tudelilla, El Villar de Arnedo, Ocón, Ausejo, El Redal, Reguanera, Ausecours, Ruñea
Power: 75.19 MW.
Holder: Inexhaustible Energy of Tara, S.L. and Inexhaustible Energy of Umiko, S.L. Being Inexhaustible Energy of Tara, S.L. The promoter that represents all the mercantiles.
Projects contained:
- Tara photovoltaic installation of 25.69 MWp.
- Umiko photovoltaic installation of 49.5 MWp.
- Evacuation infrastructure:
Electrical substation SET Tauste J2 30/220 kV.
High voltage airline LAAT 220 kV SET Tauste J2 30/220 kV – SET Fréscano 220/400 kV 33,583 kilometers long.
Electrical substation SET Fréscano 400/220 kV.
High voltage airline LAAT 400 kV SET Fréscano 220/400 kV – SET Promoters Jundiz 400/220 kV of 185,014 kilometers in length.
Electrical substation SET Promoters Jundiz 400/220 kV.
Línea Aéreo-Subterránea 220 kV SET Promotores Jundiz 400/220 kV – SET Jundiz 220KV (REE) de 1,962 kilómetros de longitud.
STATUS OF THE FILE:
Prior administrative authorization and environmental impact statement.
- Starting date for processing: 09/08/2021.
- Public Information BOE: 10/14/2021.
- Public information BOP Zaragoza: 19/10/2021.
- Public information BOP Álava: 10/11/2021.
- Public information BOP Navarra: 10/22/2021.
- Public information BOP La Rioja: 10/18/2021.
- Public information BOP Burgos: 10/27/2021.
- DIA Resolution: 24/11/2023.