PEol-731 AC. Secretariat of 42 MW and Securita of 48 MW wind installations and their evacuation infrastructure in the provinces of Zaragoza and Álava.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Tauste, Boquiñeni, Luceni, Ejea de los Caballeros and Pedrola (Zaragoza) and in Victoria-Gasteiz (Álava).
- Evacuation infrastructure: Luceni, Boquiñeni, Tauste and Ejea de los Caballeros (Zaragoza) and in Vitoria-Gasteiz (Álava).
Power: 90 MW.
Holder: Inexhaustible Energy of Secretariat, S.L. and Inexhaustible Energy of Securita, S.L. Being Inexhaustible Energy of Secretariat, S.L. The promoter that represents all the mercantiles.
Projects contained:
- Secretariat wind installation of 42 MW.
- Securita wind installation of 48 MW.
- Evacuation infrastructure:
Electrical substation SET Boquiñeni.
High voltage airline LAAT SET Boquiñeni – SET Vitoria400, of 30,236 kilometers.
Electrical substation SET Remolinos.
Electrical substation SET Tauste V400.
Electrical substation SET promoters vitoria 400.
The rest of the shared evacuation infrastructure is included in the PFot-677 AC and PEol-522 AC files.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement: