PEol-555. Alto del Fraile wind installation of 44 MW and its evacuation infrastructure in the provinces of Zaragoza and Navarra.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Tarazona (Zaragoza).
- Evacuation infrastructure: Tarazona (Zaragoza); Cascante, Murchante and Tudela (Navarra).
Power: 44 MW.
Holder: Enerfin Renewables II S.L.U.
Projects contained:
- Alto del Fraile wind installation of 44 MW.
- Evacuation infrastructure:
SET Alto del Fraile 33/66 kV.
Air evacuation line (14,100 meters) and underground (8,986 meters) of 66 kV from SET Alto del Fraile 33/66 kV to SET Colecora Promoters Tudela 33/66/220. Part of this evacuation line will be shared with the Cascante II wind farm project and its evacuation infrastructure, promoted by Viento Cascante, SLU, (File 1154-CE).
SET Collecting Promoters Tudela 33/66/220.
Airline (1,306 meters) and underground (860 meters) of 220 kV from SET Colecora Promotors Tudela 33/66/220 to Measurement Center.
Center of Measurement.
Underground line (550 meters) of 220 kV from the Measurement Center to the assigned position in the Electricity Network Substation of Spain of Tudela 220 kV.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement:
- Starting date for processing: 07/20/2021.
- Public Information BOE: 10/19/2021.
- Public information BOP Zaragoza: 10/22/2021.
- Public information BOP Navarra: 10/22/2021.