PEol-482 AC. Angus, Brigid, Felis, Dian, Fulgora, Belenus, Electra and Fontus wind installations of 49.5 MW each, Epona of 49 MW, and their evacuation infrastructures, in the provinces of Teruel and Zaragoza.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Azuara, Almonacid de la Cuba, Herrera de los Navarros, Lagata, Lécera, Moneva, Moyuela, Plenas, Villar de los Navarros (Zaragoza); Ariño, Alacón, Albalate del Arzobispo, Blesa, Hijar, Huesa del Comune, Muniesa (Teruel).
- Evacuation infrastructure: Azuara, Samper del Salz, Lagata, Letux and Lécera (Zaragoza).
Power: 445 MW.
Holder: Renewable Energies of Angus S.L., Renewable Energies of Brigid S.L., Renewable Energies of Felis S.L., Renewable Energies of Dian S.L., Renewable Energies of Fulgora S.L., Renewable Energies of Belenus S.L., Renewable Energies of Epona S.L., Renewable Energies of Electra S.L. and Renewable Energies of Fontus S.L. Being Renewable Energies Fulgora S.L. The promoter that represents all the mercantiles.
Projects contained:
- Taranis wind installation of 49.5 MW (Unfavorable in the DIA).
- Angus wind installation of 49.5 MW.
- Brigid’s wind installation of 49.5 MW.
- Felis’ wind installation of 49.5 MW.
- Dian’s wind installation of 49.5 MW.
- Fulgora’s wind installation of 49.5 MW.
- Belenus’ 49.5 MW wind facility.
- Epona wind installation of 49 MW.
- Electra’s wind installation of 49.5 MW.
- Wind installation of Fontus of 49.5 MW.
- Evacuation infrastructure:
Electrical substation SET Zuwara.
LSAT 132 kV "SET Zuwara – SET Lécera GEN".
The rest of the shared evacuation infrastructure is included in the PFot-539 AC file.
STATUS OF THE FILE:
Environmental impact statement and prior administrative authorization:
- Starting date for processing: 04/16/2021.
- Public Information BOE: 09/06/2021.
- Public information BOP Zaragoza: 28/08/2021.
- Public information BOP Teruel: 08/11/2021.
- DIA Resolution: 14/04/2023.
- Resolution AAP Angus: 13/07/2023.
- Resolution AAP Brigid: 13/07/2023.
- Resolution AAP Felis: 13/07/2023.
- Resolution AAP Dian: 13/07/2023.
- Resolution AAP Fulgora: 13/07/2023.
- Resolution AAP Belenus: 14/07/2023.
- Resolution AAP Epona: 14/07/2023.
- Resolution AAP Electra: 14/07/2023.
- Resolution AAP Fontus: 13/07/2023.
- Resolution AAP Taranis: 13/11/2024.
Modification of prior administrative authorization, administrative authorization of construction and declaration of public utility:
- Public Information BOE: 11/06/2024.
- Public information BOP Zaragoza: 15/06/2024.
- Public information BOP Teruel: 13/06/2024.
- Resolution modification of AAP, AAC and DUP Angus: 08/07/2025.
- Resolution modification of AAP, AAC and DUP Brigid: 08/07/2025.
- Resolution modification of AAP, AAC and DUP Felis: 08/07/2025.
- Resolution modification of AAP, AAC and DUP Dian: 08/07/2025.
- Resolution modification of AAP, AAC and DUP Fulgora: 08/07/2025.
- Resolution modification of AAP, AAC and DUP Belenus: 08/07/2025.
- Resolution modification of AAP, AAC and DUP Epona: 08/07/2025.
- Resolution modification of AAP, AAC and DUP Electra: 08/07/2025.
- Resolution modification of AAP, AAC and DUP Fontus: 08/07/2025.
- Error correction resolution modification of AAP, AAC and DUP Belenus: 28/08/2025.
- Error correction resolution modification of AAP, AAC and DUP Epona: 28/08/2025.
- Error correction resolution modification of AAP, AAC and DUP Electra: 28/08/2025.
Voluntary resignation of the Bodega, Hefesto, Metis and Nazario parks: 24/01/2022.