PEol-432. Jalón 2050 wind installation of 100 MW and its evacuation infrastructure in the province of Zaragoza.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Villar de los Navarros (Zaragoza).
- Evacuation infrastructure: Villar de los Navarros, Azuara and Moyuela (Zaragoza).
Power: 100 MW.
Holder: JORGE ENERGY X, S.L.
Projects contained:
- Jalón 2050 wind farm of 100 MW.
- The evacuation infrastructure:
Wind substation Rueda 220/30 kV.
High voltage overhead line in 220kV, with origin in Wind substation Rueda and final in Pre-Rueda 400/220 kV, divided two sections.
Pre-Wheel Substation 400/220 kV. Shared with the Rueda Solar photovoltaic installation (file SGEE/PFot-322 of the General Subdirectorate of Electrical Energy).
High voltage overhead line 400 kV from Pre-Rueda substation to Rueda de Jalón substation 400 kV from REE (link installation). Shared with the Rueda Solar photovoltaic installation (file SGEE/PFot-322 of the General Subdirectorate of Electrical Energy).
STATUS OF THE FILE:
Prior administrative authorisation, impact statement and declaration of public utility:
- Starting date for processing: 08/12/2020 (AAP and DIA) – 04/01/2021 (DUP).
- First public information BOE: 01/16/2021.
- First public information BOP Zaragoza: 18/01/2021.
- Second public information BOE correction: 24/02/21.
- Second public information BOP Zaragoza correction: 01/03/2021.
- DIA Resolution: 23/01/2023.
- AAP Dismissal Resolution: 09/10/2024.
Administrative authorization of construction:
- Starting date for processing: 12/22/2021.
- Public Information BOE: 09/05/2022.
- Public information BOP Zaragoza: 12/05/2022.