PEol-841. 86.72 MW of Los Sarmiento wind power plant and its evacuation infrastructure in the province of Zaragoza.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Fabara, Caspe, Nonaspe and Mequinenza (Zaragoza).
- Evacuation infrastructure: Fabara and Mequinenza (Zaragoza).
Power: 86.72 MW.
Holder: Green Capital Development XV, SLU.
Projects contained:
- Wind installation Los Sarmiento of 86.72 MW.
- Evacuation infrastructure:
SET Los Sarmiento 30/220 kV, in the municipality of Fabara, in Zaragoza.
High voltage airline LAAT 220 kV “SET Los Sarment-SET extension Tides” of 13.35 kilometers, in the terms of Fabara and Mequinenza, in Zaragoza.
Substation SET extension Mareas, in the municipality of Mequinenza, in Zaragoza.
The rest of the evacuation infrastructure is not included in this file.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement:
- Starting date for processing: 31/05/2023.
- Public Information BOE: 04/07/2023.
- Public information BOP Zaragoza: 04/07/2023.
- DIA Resolution: 07/07/2025.