PFot-320. Hiberus Solar photovoltaic installation of 281 MW and its evacuation infrastructure in the provinces of Huesca and Zaragoza.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Castejón de Monegros, Ballobar, Candasnos, Fraga, Ontiñena, Sena, Villanueva de Sigena and Torrente de Cinca (Huesca) and Mequinenza (Zaragoza).
- Evacuation infrastructure: Castejón de Monegros, Ballobar, Candasnos, Fraga, Ontiñena, Sena, Villanueva de Sigena and Torrente de Cinca (Huesca) and Mequinenza (Zaragoza).
Power: 281 MW.
Holder: JORGE ENERGY IV, S.L.
Projects contained:
- Photovoltaic installation Hiberus Solar of 281 MW.
- Evacuation infrastructure:
Hiberus 400/30 kV lifting substation.
LAAT in 400kV, with origin in Hiberus 400/30 kV substation and final in Libienergy 400/30 kV substation, simple circuit, staggered arrangement, of 37,064 km in length.
Libienergy 400/30 kV substation.
LAAT in 400kV, with origin in substation Libienergy 400/30 kV and final in substation Almendra Promoters 400, of simple circuit, staggered arrangement, of 18,713 km in length.
Electric substation 400 kV Almendra Promoters, shared with several promoters.
LAAT 400 kV from Almendra Promoters substation to Almendra 400 kV substation of REE.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement:
- Starting date for processing: 04/12/2020.
- Public Information BOE: 02/09/2021.
- Public information BOP Huesca: 02/09/2021 (pdf)
- DIA Resolution: 24/01/2023.
- AAP Resolution: 26/01/2024.