PFot-1144 AC. Atria photovoltaic installations of 32.74 MWins, Avior of 32.74 MWins and Gondul of 22.92 MWins in the province of Huesca.
INFORMATION OF THE FILE:
Municipal terms:
Park: Fraga (Huesca).
Power: 88.4 MWins.
Headline: Inexhaustible Energy of Atria, S.L., Inexhaustible Energy of Avior, S.L. and Inexhaustible Energy of Gondul, S.L. Being Inexhaustible Energy of Atria, S.L. The promoter that represents all the mercantiles.
Projects content:
Atria photovoltaic installation of 32.74 MWins.
Photovoltaic installation Avior of 32.74 MWins.
Gondul photovoltaic installation of 22.92 MWins.
The evacuation infrastructure is included in the PEol-932 AC file.
STATUS OF THE FILE:
Environmental impact statement and prior administrative authorization: