PEol-677 AC. Wezen, Taurus, Ran, Tabit, Telescopium, Vega and Virgo wind installations of 49.50 MW each and their evacuation infrastructure in the provinces of Huesca and Barcelona.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Ontiñena, Peñalba and Villanueva de Sigena (Huesca).
- Evacuation infrastructure: Ontiñena, (Huesca); Olérdola, La Granada, San Cugat Ses Garrigues and Vilafranca del Penedés (Barcelona).
Power: 346.5 MW.
Holder: Inexhaustible Energy of Wezen, S.L., Inexhaustible Energy of Taurus, S.L., Inexhaustible Energy of Ran, S.L., Inexhaustible Energy of Tabit, S.L., Inexhaustible Energy of Telescopium, S.L., Energía Inagotable de Vega, S.L. and Inexhaustible Energy of Virgo, S.L. Being Inexhaustible Energy of Ran, S.L. The promoter that represents all the mercantiles.
Projects contained:
- Wezen wind installation of 49.5 MW.
- Taurus wind installation of 49.5 MW.
- Ran wind installation of 49.5 MW.
- Tabit wind installation of 49.5 MW.
- Telescopium wind installation of 49.5 MW.
- Vega wind installation of 49.5 MW.
- Virgo wind installation of 49.5 MW.
- Evacuation infrastructure:
OPTION DRAWN TO: Aerial tracing 400 kV to the SET Promotors Penedès where it becomes underground and transforms to the voltage of 220 kV. From there, by simple tracing of the 220 kV underground circuit, it is evacuated to the SET Penedés 220 kV, point of connection with REE.
Ontiñena substation 30/132/400 kV.
LAAT 400kV SET Ontiñena – SET Promotores Penedés tramo de 5.438metros de longitud.
SET Promoters Penedès.
LSAT 220kV SET Promotores Penedés – SET Penedés (REE) de 251metros de longitud.
OPTION PLOTTED B: Air section 400 kV to the SET Promoters Penedès South where it becomes double underground circuit 220kV to the CS Penedès. From there, by simple tracing of the 220 kV underground circuit, it is evacuated to the SET Penedés 220 kV, point of connection with REE.
Ontiñena substation 30/132/400 kV.
LASAT 400kV SET Ontiñena – SET Promotores Penedés Sur – CS Penedés, tramo de 5.443 metros de longitud.
SET Promoters South Penedès.
Penedès Sectioning Center 220 kV (CS Penedès).
LSAT 220 kV CS Penedés – SET Penedés (REE) of 251 meters in length.
The rest of the shared evacuation infrastructure is included in the PEol-571 AC, PEol-556, PEol-563 AC and PFot-539 AC files.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement:
- Starting date for processing: 16/08/2021.
- Public Information BOE: 02/24/2022.
- Public information BOP Huesca: 02/23/2022.
- Public information Official Journal of the Government of Catalonia: 04/03/2022.
- DIA Resolution: 04/09/2023.
- Resolution AAP Wezen: 05/12/2023.
- Resolution AAP Ran: 04/12/2023.
- Resolution AAP Vega: 05/12/2023.
- Resolution AAP Virgo: 05/12/2023.