PFot-677. Ume photovoltaic installation of 14.7 MWp and its evacuation infrastructure in the provinces of Zaragoza, Navarra, Guipúzcoa and Vizcaya.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Castejón de Valdejasa (Zaragoza).
- Evacuation infrastructure: Castejón de Valdejasa, Ejea de los Caballeros, Biota y Sáabas (Zaragoza); Alsasua (Navarra); Idiazabal, Pazonería General de Guipúzcoa y Álava, Ormaiztegi, Gabiria, Legazpi, Antzuola, Bergara y Elgeta (Guipúzcoa); Zaldibar, Berriz, Garai, Irrueta, Muxica, Amorebieta, Larrabetzu, Lezama, Bertica, Vizio (Munca).
Power: 14.7 MWp.
Holder: Inexhaustible Energy of Ume, S.L.
Projects contained:
- Photovoltaic installation Ume of 14.7 MWp.
- Evacuation infrastructure:
Electrical substation 30/220 kV SET Valdejasa 1.
High voltage airline LAAT 220 kV SET Valdejasa 1 – Nudo Valdejasa 2 of 3,189 Km in length.
High voltage airline LAAT 220 kV Nudo Valdejasa 2 – Nudo Valdejasa, 4,199 km long.
High voltage airline LAAT 220 kV Nudo Valdejasa – Nudo Sabinar, 8,816 km long.
High voltage airline LAAT 220 kV Knodo Sabinar – SET Sabinar, 4,438 km long.
Electrical substation 30/220 kV SET Sabinar.
High voltage airline LAAT 220 kV Nudo Sabinar – Nudo Ejea, 7,496 km long.
Electrical substation 30/220/400 kV SET Ejea De Los Caballeros.
High voltage airline LAAT 400 kV Nudo Ejea – Nudo Bayo, of 34,581 Km in length.
High voltage airline LAAT 400 kV NUDO Alsasua – SET GATICA 400 compensation, of 79,168 Km in length.
Electrical substation SET Compensation GATICA 400.
High voltage airline LAAT 400 kV SET Compensation GATICA 400 – SET GATICA 400 REE, 1,802 km long.
The rest of the shared evacuation infrastructure is included in the PEol-522 AC file.
STATUS OF THE FILE:
Prior administrative authorization and environmental impact statement.