PEol-729 AC. Salus 42 MW wind farms, Saritor 18.25 MW, Sancus 48 MW, Rumina 48 MW, Rusor 30 MW, Runcia 24 MW and Salacia 42 MW in the province of Zaragoza.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Tauste and Gallur (Zaragoza).
Power: 252.25 MW.
Holder: Inexhaustible Energy of Salus, S.L., Inexhaustible Energy of Saritor, S.L., Inexhaustible Energy of Sancus, S.L., Inexhaustible Energy of Rumina, S.L., Energía Inagotable de Rusor, S.L, Energía Inagotable de Runcia, S.L. and Inexhaustible Energy of Salacia, S.L. Being Inexhaustible Energy of Sancus, S.L. The promoter that represents all the mercantiles.
Projects contained:
- Salus wind installation of 42 MW.
- Wind installation Saritor 18.25 MW.
- Sancus wind installation of 48 MW.
- Rumina wind installation of 48 MW.
- Rusor wind installation of 30 MW.
- Runcia wind installation of 24 MW.
- Salacia wind installation of 42 MW.
- Evacuation infrastructure:
The evacuation infrastructure is included in the PEol-731 AC, PFot-677 AC and PEol-522 AC files.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement:
- Starting date for processing: 06/10/2021.
- Public Information BOE: 26/02/2022.
- Public information BOP Zaragoza: 04/03/2022.
- DIA Resolution: 11/22/2023.
- Resolution AAP Salus: 04/10/2024.
- Resolution AAP Saritor: 04/10/2024.
- Resolution AAP Sancus: 04/10/2024.
- Resolution AAP Rumina: 04/10/2024.
- Resolution AAP Rusor: 04/10/2024.
- Resolution AAP Runcia: 04/10/2024.
- Resolution AAP Salacia: 04/10/2024.