PEol-540 AC. Cerbero, Menecio, Oalas, Perses, Odiseo, Selene and Creton wind installations of 49.5 MW each and their evacuation infrastructure in the provinces of Zaragoza, Teruel, Tarragona and Barcelona.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Maella (Zaragoza); Belmonte de San José, La Codoñera, Mazaleón, Valdealgorfa, Valdetormo and Valjunquera (Teruel).
- Evacuation infrastructure: Maella (Zaragoza); Valdealgorfa, Alcañiz, Mazaleón, Valdeltormo, Belmonte de San José, La Codoñera, Torrecilla de Alcañiz, Fórnoles y Valjunquera (Teruel); La Bisbal del Penedès, Llorenç del Penedès, Banyeres del Penedès y Bellvei (Tarragona); Castellet i la Gornal, Cubelles y Vilanova i la Geltrú (Barcelona).
Power: 346.5 MW.
Holder: Inexhaustible Energy of Cerbero, S.L., Inexhaustible Energy of Menecio, S.L., Inexhaustible Energy of Oalas, S.L., Inexhaustible Energy of Perses, S.L., Inexhaustible Energy of Odiseo, S.L., Inexhaustible Energy of Selene, S.L. and Inexhaustible Energy of Cretón, S.L. Ser Energía Ingotable de Cerbero, S.L. The promoter that represents all the mercantiles.
Projects contained:
- Cerbero wind installation of 49.5 MW.
- Menecio wind installation of 49.5 MW.
- Oalas wind installation of 49.5 MW.
- Perses wind installation of 49.5 MW.
- Odiseo wind installation of 49.5 MW.
- Selene wind installation of 49.5 MW.
- Creton wind installation of 49.5 MW.
- Evacuation infrastructure:
SET Valdealgorfa 220 kV.
LAAT 220 kV SET Valdealgorfa - SET Valmuel Garraf de 27,676 km de longitud. It will reach the junction with the LAAT SET Andorra Gen – SET Valmuel (included in the file PEol-493 AC) in support 68, where it will connect to the SET Valmuel Garraf (included in the file PEol-546) and the voltage will be raised to 400 kV. The energy will circulate through the LAAT SET Valmuel – SET Begues (included in the file PFot- 539 AC), until the separation in support 416.
LAAT 400 kV SET Vilalba - SET Garraf 400 kV REE (stretch from support 416 to SET Garraf 400 kV REE) of 20,818 km in length.
Valdealgorfa 30/220 kV SET.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement:
- Starting date for processing: 06/24/2021.
- Public Information BOE: 07/01/2022.
- Public information BOP Zaragoza: 24/01/2022.
- Public information BOP Teruel: 01/17/2022.
- Public information Official Journal of the Government of Catalonia: 03/02/2022.
- DIA Resolution: 06/28/2023.
- Resolution AAP Cerbero: 28/09/2023.
- Resolution AAP Menecio: 28/09/2023.
- Resolution AAP Oalas: 28/09/2023.
- Resolution AAP Odiseo: 28/09/2023.
- Resolution AAP Perses: 28/09/2023.
- Resolution AAP Selene: 28/09/2023.