PEol-409 AC. 100 MW Valentuña wind power plants, 50 MW Lorbes, 100 MW Salto del Lobo, 72 MW Miramón and 100 MW Sangorrín, and their associated evacuation infrastructures located in the provinces of Zaragoza, La Rioja and Navarra.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Castiliscar, Sos del Rey Catlico, Uncastillo, Luesia, Biota and Sáabas (Zaragoza).
- Evacuation infrastructure: Sos del Rey Catlico, Uncastillo, Castiliscar, Luesia, Sáabas and Biota (Zaragoza); Carcastillo, Santacara, Mélida, Murillo el Cuende, Caparrosas, Villafranca, Cadreita, Castejón and Tudela (Navarra); Alfaro (La Rioja).
Power: 422 MW.
Holder: Opdenergy Group: Solar Plant Opde 40, S.L., Solar Plant Opde 41, S.L., Solar Plant Opde 39, S.L., Solar Plant Opde 37, S.L. and Solar Plant Opde 36, S.L.
Projects contained:
- Valentuña wind installation of 100 MW.
- Lorbes wind installation of 50 MW.
- 100 MW of Salto del Lobo wind installation.
- Miramón wind installation of 72 MW.
- Sangorrín wind installation of 100 MW.
- Evacuation infrastructure:
SET Lorbes 66/30 kV.
Line 66 kV SET Lorbes - SET Valentuña: SC line.
SET Valentuña 220/66/30 kV: evacuates the energy of the PE Valentuña, PE Lorbes and PE Salto del Lobo.
Line 220 kV SET Valentuña – SET Labradas and SCTO. LAT Alcarama-La Serna: DC line for the evacuation of PE Miramón and PE Sangorrín, in the Serna 220 kV by one circuit and PE Lorbes, PE Salto del Lobo and PE Valentuña, in the Serna 400 kV in the other circuit.
SET Labradas 400/220 kV: will be used for the joint evacuation with a total power of 382.20 MW until La Serna 400 kV.
Line up to SET La Serna 400 kV: SC line that will join SET Labradas and SET La Serna 400 kV.
SET Wolf Jump 66/30 kV.
Line 220/66 kV SET Salto DEL Lobo - SET Valentuña: DC line for the evacuation of the PE Salto del Lobo in La Serna 400 kV, as well as the PE Miramón and PE Sangorrín in La Serna 220 kV.
SET Miramón 220/30 kV.
Line 220 kV SET Miramón – Support LAT SET Sangorrin – Bypass SET Salto del Lobo: SC line for the evacuation of PE Miramón.
SET Sangorrin 220/30 kV.
Line 220 kV SET Sangorrín – BYPASS SET Salto del Lobo: DC and SC line for the evacuation of PE Sangorrín and PE Miramón in La Serna 220 kV.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement:
- Starting date for processing: 12/23/2020.
- First public information BOE: 02/27/2021.
- First public information BOP of Zaragoza: 01/03/2021.
- First public information BOP Navarra: 03/11/2021.
- First public information BOP La Rioja: 01/03/2021.
- Second public information BOE: 05/13/2021.
- Second information publication BOP of Zaragoza: 18/05/2021.
- Second information publication BOP Navarra: 05/11/2021.
- Second information publication BOP La Rioja: 05/10/2021.
- DIA Resolution: 17/01/2023.
- Resolution AAP Valentuña: 11/08/2024.
- Resolution AAP Lorbes: 11/08/2024.
- Resolution AAP Salto del Lobo: 11/08/2024.
- Resolution AAP Miramón: 11/08/2024.
- Resolution AAP Sangorrín: 11/08/2024.