PEol-659 AC. Wind installations Musca, Meridiana, Rotanev, Sagitario, Sargas, Merope, Sirius, Subra and Libra of 49.5 MW each in the province of Huesca
INFORMATION OF THE FILE:
Municipal terms:
- Park: Albero Bajo, Albero Alto, Sangarrén, Barbués, Grañen, Tramaced, Huerto, Sesa, Salillas, Lalueza, Alberuela del Barco and Almuniente (Huesca).
Power: 445.5 MW.
Holder: Inexhaustible Energy of Musca, S.L., Inexhaustible Energy of Meridiana, S.L., Inexhaustible Energy of Rotanev, S.L., Inexhaustible Energy of Sagitario, S.L., Inexhaustible Energy of Sargas, S.L., Inexhaustible Energy of Merope, S.L., Inexhaustible Energy of Sirius, S.L., Inexhaustible Energy of Subra, S.L. and Inexhaustible Energy of Libra, S.L. Being Inexhaustible Energy of Libra, S.L. The promoter that represents all the mercantiles.
Projects contained:
- Musca wind installation of 49.5 MW.
- Meridiana wind installation of 49.5 MW.
- Rotanev wind installation of 49.5 MW.
- Sagittarius wind installation of 49.5 MW.
- Sargas wind installation of 49.5 MW.
- Merope wind installation of 49.5 MW.
- Sirius wind installation of 49.5 MW.
- Subra wind installation of 49.5 MW.
- Wind installation Libra of 49.5 MW.
The evacuation infrastructure is included in the PEol-556 file.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement:
- Starting date for processing: 08/16/2021
- Public Information BOE: 17/03/2022.
- Public information BOP Huesca: 16/03/2022.
- DIA Resolution: 28/08/2023.
- Resolution AAP Musca: 27/11/2023.
- RAAP Meridiana solution: 27/11/2023.Resolution AAP Rotanev: 27/11/2023.
- Resolution AAP Sagittarius: 27/11/2023.
- Resolution AAP Sargas: 27/11/2023.
- Resolution AAP Merope: 27/11/2023.
- Resolution AAP Sirius: 27/11/2023.
- Resolution AAP Subra: 27/11/2023.
- Resolution AAP Libra: 27/11/2023.