PEol-560 AC. Alcione, Propus, Polaris and Ain wind installations of 49.50 MW each and their evacuation infrastructure in the province of Huesca.
INFORMATION OF THE FILE:
Municipal terms:
- Park: Sariñena and Villanueva de Sigena (Huesca).
- Evacuation infrastructure: Sariñena (Huesca).
Power: 198 MW.
Holder: Inexhaustible Energy of Polaris, S.L., Inexhaustible Energy of Alcione, S.L., Inexhaustible Energy of Propus, S.L. and Inexhaustible Energy of Ain, S.L. Being Inexhaustible Energy of Polaris, S.L. The representative of the rest of the mercantiles.
Projects contained:
- Alcione wind installation of 49.50 MW.
- Propus wind installation of 49.50 MW.
- Polaris wind installation of 49.50 MW.
- Ain wind installation of 49.50 MW.
- Evacuation infrastructure:
SET Castellet East 400/30 kV.
LAAT 400 kV SET Castellet East - CES Castellet of 10,269 kilometers in length.
The rest of the evacuation infrastructure is included in the PEol-556, PFot-539 AC, PEol-540 AC and PEol-563 AC files.
STATUS OF THE FILE:
Prior administrative authorisation and environmental impact statement: